Mechanical Installation
9
2.3.2. Unpacking
Vertiv
™
Liebert® XDO cabinet is packed with wooden boxes. After moving the unit to the nearest place of final installation,
unpack the unit.
The unpacking procedures are as follows:
1. First remove the top cover and winding stretch film, then remove the honeycomb cardboard and foam board,
as shown in
Figure 2-5 Unpacking the Unit
2. Remove the bottom pallet, the unit is fixed on the bottom pallet with M8 x 20 and M8 x 80 screws (as shown in
), and a 17 mm open wrench, ratchet wrench or socket can be used for disassembly.
ITEMS
DESCRIPTION
ITEMS DESCRIPTION
1
Screw GB9074_13-88_M8 x 20
2
Hexagon head bolt GB/T 5782-2000_M8 x 80
Figure 2-6 Bottom Pallet Screw Fixing Position