Heat output
Full Load Heat Output, BTU/hr (kW)
kVA
BTU/hr (kW)
15
1915 (0.56)
30
3995 (0.88)
50
4360 (1.28)
75
6140 (1.80)
100
7680 (2.25)
125
9460 (2.77)
150
10,660 (3.13)
200
13,930 (4.08)
225
15,350 (4.45)
18 in. (457mm)
minimum clearance
above unit for
cooling air flow
ADDITIONAL ACCESS ON EITHER
SIDE OR THE REAR OF UNIT - see
Notes 1 and 2
6 in. (152 mm) minimum
clearance below unit for
bottom cable exit
NOTES:
1.
Service access is required at the front, plus one other side or rear.
2.
Service access clearance:
36 in. (914 mm) for units up to 150 volts to ground
42 in. (1067 mm) for units over 150 volts to ground