Vertiv | Liebert
®
NXL
™
500-750kVA UPS Installation Manual |
1
IMPORTANT SAFETY INSTRUCTIONS
SAVE THESE INSTRUCTIONS
This manual contains important instructions that should be followed during installation of your
Liebert
®
NXL
™
UPS. Read this manual thoroughly, paying special attention to the sections that
apply to your installation, before working with the UPS. Retain this manual for use by installing
personnel.
WARNING
Risk of electrical shock. Can cause personal injury or death.
This UPS has several circuits that are energized with high DC as well as AC voltages. Check
for voltage with both AC and DC voltmeters before working within the UPS. Check for
voltage with both AC and DC voltmeters before making contact.
Only properly trained and qualified personnel wearing appropriate safety headgear, gloves,
shoes and glasses should be involved in installing the UPS or preparing the UPS for
installation. When performing maintenance with any part of the equipment under power,
service personnel and test equipment should be standing on rubber mats.
In case of fire involving electrical equipment, use only carbon dioxide fire extinguishers or
those approved for use in fighting electrical fires.
Extreme caution is required when performing installation and maintenance.
Special safety precautions are required for procedures involving handling, installation and
maintenance of the UPS system. Observe all safety precautions in this manual before
handling or installing the UPS system. Observe all precautions in the Operation and
Maintenance Manual, SL-25425, before as well as during performance of all maintenance
procedures. Observe all DC safety precautions before working on or near the DC system.
WARNING
Risk of heavy unit falling over. Improper handling can cause equipment damage, injury or
death.
Exercise extreme care when handling UPS cabinets to avoid equipment damage or injury
to personnel. The UPS module weight is up to 13,800lb. (6260kg).
Locate center of gravity symbols
and determine unit weight before handling each
cabinet. Test lift and balance the cabinets before transporting. Maintain minimum tilt from
vertical at all times.
Slots at the base of the module cabinets are intended for forklift use. Base slots will support
the unit only if the forks are completely beneath the unit.
Read all of the following instructions before attempting to move, lift, or remove packaging
from unit, or prepare unit for installation.
Содержание Liebert NXL 500kVA
Страница 73: ...Vertiv Liebert NXL 500 750kVA UPS Installation Manual 67 NOTES...
Страница 74: ...Vertiv Liebert NXL 500 750kVA UPS Installation Manual 68...
Страница 75: ......