Vertiv | Liebert
®
NXL
™
500-750kVA UPS Installation Manual |
49
Figure 36 Shipping split 625/750kVA Liebert
®
NXL
™
without static bypass
WH P/N
START
(Part A - Rectifier Cabinet)
FINISH
(Part B - Inverter Cabinet)
LABEL
531985G1
UPSC (Control Door)
02-806704 - Inverter Gate Drive A
To: 02-806704- Phase A
ID: P0400A
531988G2
UPSC (Control Door)
02-806707 - Load VI
To: 02-806707-
ID: P0700
531983G1
UPSC (Control Door)
02-806707- Load VI
To: 02-806707-
ID: P0701
531985G2
UPSC (Control Door)
02-806704 - Inverter Gate Drive B
To: 02-806704- Phase B
ID: P0400B
531985G3
UPSC (Control Door)
02-806704 - Inverter Gate Drive C
To: 02-806704-Phase C
ID: P0400C
532061G1
Power Supply
02-806716 - AC Distribution Board
To: 02-806716-__
Connection ID: P1305
WH P/N: 532061G1
(+) DC Busbar
(-) DC Busbar
M10 Flat W
a
sher
M10 Ribbed W
a
sher (2x)
M10 Hex Head Bolt
Low-V
oltage Wire Connections
Between Part
A
and Part B
Wires are coiled and tied in Part
A.
Uncoil, route and connect wires in finish part as shown.
Use wire label as guide for "to" component, connection
ID and wire part number
.
T
ie wires away from sharp
edges, busbar and electronic components.
02-806716-
02-806704-
Phase A
02-806704-
Phase B
02-806704-
Phase C
02-806707-
Hardware
for Detail
A
Included
in This
Box
Loosen hardware to allow
busbar to move to join
to Part B Busbar
.
Retighten and torque
to 27 N-m (240 in-lb)
Part
A
(Rectifier) - Wire Starting Point
531985GI
531988G2
531983G1
A
531985G2
531985G3
532061G1
Detail A
DC Power Connection Between Part
A
and Part B
Hardware Provided With Part B: 4 Bolts
T
o
tal
T
o
rque Connection
T
o
27 N-m (240 In-lbs)
Part B (Inverter) - Wire Finishing Point
Содержание Liebert NXL 500kVA
Страница 73: ...Vertiv Liebert NXL 500 750kVA UPS Installation Manual 67 NOTES...
Страница 74: ...Vertiv Liebert NXL 500 750kVA UPS Installation Manual 68...
Страница 75: ......