
Vertiv
| Liebert
®
ITA2
™
User Manual |
26
Figure 22 Battery insulating plate
Installing the Battery Cabinet
1.
Before installation, inspect the appearance and accessories of the battery, and cabinet and if there are
any signs of damage, contact Vertiv Services at 800-543-2378.
2.
Maintain at least 10mm clearances between the front, rear, side panels of the battery and the wall or
adjacent equipment to keep well-ventilated.
3.
Maintain some clearances between the top of the battery and the upper baffle to facilitate monitoring and
maintenance of the battery.
4.
Install the batteries from the bottom to the top to minimize any tipping hazard. Place the battery well to
avoid shake and impact.
Содержание Liebert ITA2-08KRT208
Страница 1: ...Liebert ITA2 8 10kVA 60Hz 208 220V Three Phase UPS User Manual...
Страница 40: ...Vertiv Liebert ITA2 User Manual 34 Figure 31 Status page menus...
Страница 42: ...Vertiv Liebert ITA2 User Manual 36 Figure 34 Settings Page menus continued Monitor Pg 2 System Pg 2...
Страница 70: ...Vertiv Liebert ITA2 User Manual 64 NOTES...
Страница 71: ...Vertiv Liebert ITA2 User Manual 65...
Страница 72: ...Vertiv Liebert ITA2 User Manual 66...
Страница 73: ......