Vertiv™ XTE 802G Generator Room Walk-In-Cabinet Description and Installation Manual
23
5.3
Tools and Test Equipment Required for Installation
The following tools, test equipment and materials are required for the physical installation of the XTE 802G:
•
Non-contact voltage detector
•
Digital multimeter (DMM), 0 to 200 V dc, 0 to 300 V ac
-
Digital clamp-on meter, 0 to 30 A dc, 0 to 60 V ac, recommended
•
Torque wrench
•
Ratchet drive, extensions, sockets
•
Carpenter’s level
•
Lineman’s scissors
•
Lineman’s strippers
•
Lineman’s cutters
•
Appropriate crimping tool with dies
•
Electrician’s insulated screwdrivers, Phillips, No. 1 and 2
•
Electrician’s insulated screwdrivers, flat-blade, small and large
•
Insulated nut drivers for battery installation.
•
Silicone sealant
•
NO-OX-ID-A or approved equivalent
Outside the scope of this document are the tools to fish, splice, and terminate OSP cables.
Equipment associated with lifting the XTE 802G by the eyebolts is listed separately, in a subsequent section.