Vertiv™ XTE 802G Generator Room Walk-In-Cabinet Description and Installation Manual
13
Working Space Requirements
See
on page 8 for working space requirements.
Foundation Options
Helical Foundation Kit - Single Point Leveling (P/N D1000-0000-0101)
(for Mounting XTE 802G Separate from the XTE 802) (Two Required)
Consists of four (4) self drilling helicals, four (4) corner plates, leveling hardware, and stairs. Each helical is 6 inches in diameter and 7
feet in length. One helical will be located in each corner and will be drilled into the ground to 11 inches of grade (on the door side of
the unit if on a slope). One leveling hardware set will be installed in each helical, then the four (4) corner plates will be installed on top
of the leveling hardware. The unit will then be bolted to the corner plates using the appropriate provided hardware. The stairs are
then attached to the unit.
NOTE!
For grounding purposes, NEC requires a minimum of 10 vertical feet of helical in the ground.
Combo Foundation Options
Combo Helical Platform (P/N D1000-0010-0171)
If ordered through CEEOT, this platform will ship to the site completely configured with XTE 802 and XTE 802G including all conduit
and cabling. Consists of four (4) self drilling helicals, one (1) platform, two (2) stairs, and leveling hardware. Each helical is 8 inches in
diameter and 7 feet in length. Each helical will be drilled into the ground to 6 inches of grade (on the door side of the unit if on a
slope). Four leveling hardware sets will be installed in each helical, then the platform will be installed on top of the leveling hardware.
The stairs are then attached to the XTE 802 and the XTE 802G.
NOTE!
For grounding purposes, NEC requires a minimum of 10 vertical feet of helical in the ground.
Combo Concrete / On the Ground Platform (P/N D1000-0010-0179)
If ordered through CEEOT, this platform will ship to the site completely configured with XTE 802 and XTE 802G including all conduit
and cabling. Platform ships complete. Consists of three (3) skis, one (1) platform, two (2) stairs, and leveling hardware. Platform is
simply lifted and set on the ground or concrete. Each ski has three leveling points for adjustments. The stairs are then attached to
the XTE 802 and the XTE 802G.