Vertiv™ NetSure™ IPE Series -48 VDC Outdoor Rectifier Installation and User Manual
Proprietary and Confidential © 2022 Vertiv Group Corp.
57
3.10
Customer Wiring Connection Procedure
3.10.1
Customer Wiring Connection Procedure for PG Terminal
After finishing pre-install of customer cables, remove the rectifier access panel and connect power cord and wire harnesses
according to the following procedures. Refer to Figure 3.6 and the illustrations in the following procedure. Refer also to Table 3.3.
Figure 3.6 Customer Wiring Connection Interface
Table 3.3 Designation for Customer Wiring Connection
Designation
Cable Gland Connector
Acceptable Cable Outer Diameter Range (mm)
Connect to
COM
M25 Cable Gland
< 11
4 x DO
< 5.6
/
< 5.6
/
LOAD1
PG29 Cable Gland
13~20
2KW DC and Output1-
BAT
PG29 Cable Gland
13~20
2KW BAT Input
and Output2-
LOAD2
PG21 Cable Gland
9~16
1KW DC
and Output3-
LOAD3
PG21 Cable Gland
9~16
1KW DC
and Output4-
PWR
PG13.5 Cable Gland
6~12
AC Input
L+N+PE
Procedure
1.
Refer to “Opening / Closing the Front Access Panel” on page 75, and open the rectifier enclosure front access panel.
Tighten the hardware indicated in the procedure to secure the access cover in the open position.
2.
Remove the cable gland caps and sealing pins from the connectors to be used. Refer to Figure 3.7.
DANGER!
If the connector will not be used, DO NOT remove the caps and sealing pins as they are necessary to ensure
IP65 compliance.
4*DO(8C)
2 KW DC
OUTPUT
BATTERY
1 KW DC
OUTPUT
1 KW DC
OUTPUT
AC INPUT
Note: The holes for COM can be changed appropriately according to the hole diameter.
COM
Large COMM Gland
RS485_A
RS485_B