Figure 3.7 Remove the Cable Gland Caps and Sealing Pin from Cable Gland Connectors to be Used
3.
Feed the cables through the cable glands.
4.
Slide appropriate cable into the designation position of the terminal block. Refer to Figure 3.8.
NOTE!
All cables shall always have the outer sheath firmly fixed to places where appropriate to stop the wires pulling out
of the terminals/connectors, and avoid sheath degrades.
5.
Tighten the screw of the terminal block as required.
6.
Tighten the caps of cable gland connectors as required.
Figure 3.8 Customer Wiring Connection
Caps and Sealing pins
OUT1+
OUT1-
OUT2+
OUT2- OUT3+ OUT3-OUT4+ OUT4-
1A1B2A2B
See Detail A
Digital Output1
Digital Output1
Digital Output2
Digital Output2
Digital Output3
Digital Output3
CAN-
CAN+
Digital Output4
Digital Output4
Digital input
Digital input
Caps of DC output & Com cable gland
Caps of AC input cable gland
OUT1+
OUT1-
OUT2+
OUT2- OUT3+ OUT3-OUT4+ OUT4-
1A1B2A2B
2kW DC output connection
1kW DC output and AC input connection
1A1B2A2B
1A and 1B: RS485_1 (Southbound)
for battery communication
2A and 2B: RS485_2(Northbound)
for customer communication