Vertiv | VE Series Rack | User Manual
Pre-Installation Preparation
Chapter 2: Pre-Installation Preparation
This chapter introduces the preparation of rack prior to installation, including installation tools, accessories,
transportation, unpacking, and equipment room requirements.
2.1.
Installation Tools
Floating Nut Hook
Floating nut hook (accessory included) is mainly used to install floating nuts, as shown in
Figure 2-1
. For specific
usage methods, refer to section
“3.12. Installing and Removing Floating Nut”
.
Figure 2-1 Floating Nut Hook
Other Installation Tools (user-owned)
The schematic diagram of the other installation tools is shown in
Figure 2-2
and its usage purpose is mentioned in
Table
2-1
.
Utility Knife
Phillips
Screwdriver
Active Wrench
Sleeve Wrench
Gradienter
Allen Wrench
Figure 2-2 Other Installation Tools
Table 2-1 Usage of Other Installation Tools
Name
Usage
Utility Knife
Disassembly outside the rack packaging.
Phillips Screwdriver
Tighten the screws when assembling the parts of the rack.
Active Wrench
Adjusting and removing casters and feet.
Sleeve Wrench
Remove hexagonal screws or bolts from casters and pallet fixtures.
Gradienter
Display its horizontal status when leveling the rack.
Allen Wrench
Used to adjust the rack feet.