Separate Header Installation
LD-16 Door Operator - Modernization
38
© Vertical Express
Separate Header Installation
(continued)
Figure 33 - Two-Speed Door Operator Mounting
3. Install the door track leaving a gap of
1
/
4
" –
3
/
8
" or more. See Figure 34 on page 39.
4. Install the door operator mounting angles. Use the included hardware to attach the
mounting angles, but do not tighten; leave hardware loose to allow for adjustment
when setting the door operator in place.
5. Install the door operator. Figure 35 on page 40.
a. Align the door operator with the door track and the mounting angles.
b. Verify that the door operator is level with the face of the door track.
c. Tighten all hardware.
1¼"
3¾"
D
D
D
E
Clear Opening
2SP
Clear
Opening
E
D
21½
23
24½
26
27½
29
30½
32
33½
24
25½
27
28½
30
31½
33
34½
36
36
38
40
42
44
46
48
50
52
2SP
Clear
Opening
E
D
35
36½
38
39½
41
42½
44
45½
47
48½
37½
39
40½
42
43½
45
46½
48
49½
51
54
56
58
60
62
64
66
68
70
72
(all dim. in inches)
Dimensions shown are reference points and apply to TKE or Dover equipment ONLY.
Содержание LD-16
Страница 1: ...LD 16 Door Operator FOR MODERNIZATION ...
Страница 95: ...APPENDIX ...
Страница 96: ...APPENDIX ...