Fig. 2

 

 

 

 

 

LIFT OPENING SPECIFICATIONS 

(Cont)

:

 

OPENINGS IN SOLID WOOD JOISTS:

 

When ceiling joists are solid wood, the finished opening 

must be 

30½” x 58½” with smooth side walls. 

The side 

walls must be square (perpendicular) so that the opening 

does not get smaller at the bottom. The sheet rock and 

decking must be cut flush to walls (see Fig. 2a).

 

There  must  be  no  protrusions  inside  the   opening:  

All 

nail heads must be set flush or below the surface. If joist 

hanger brackets are used, the 

2”x2”

 L-flashing (provided) 

must be installed in the corners of the opening to cover 

the hanger brackets and nail heads (see Fig. 2b below).

 

 

LIFT OPENING WITH SOLID WOOD JOISTS 

#17 x 1” nails, placing nails within 1/4” from each 

edge(Fig. 2b & Inset). 

The flashing strips are strongly 

recommended to finish all openings,  even  I-Joist openings 

that are paneled with 1/4” plywood. 

The flashing strips 

not only cover nail head and brackets, they also provide 

a slippery protective surface to guide the lifting 

platform through the opening and will reduce paint 

wear on the lifting frame.

 

 

OPENINGS IN FABRICATED JOISTS:

 

When ceiling joists are 

“I

-

Joists”

 instead of solid wood, 

the rough opening size should be 31 x 

59”,

 

½”

 larger in 

each dimension, to allow space to panel the joists with 

1/4” thick plywood (Fig. 2c). 

The 1/4” paneling will 

provide  the  required  smooth  walls  and  cover  any  joist

 

FINISHED OPENING 

SIZE IS 30.5" x58.5" 

 

 

INSTALL 2 x 2” FLASHING 

INSIDE FINISHED OPENING 

 

CUT SHEET ROCK 

FLUSH WITH OPENING 

INSTALL DECKING 

FLUSH WITH OPENING 

 

 

HOLE SIDE WALLS MUST 
BE SMOOTH AND SQUARE. 
SET NAIL HEADS FLUSH. 

hanger brackets. 

When paneled, the finished opening 

size will be 30½”x 58½”. The side walls must be square 

(perpendicular) and all nail heads must be set flush or 

below the surface. Cut all sheet rock and decking flush 

with the edges of the opening. (See pgs. 8-10 on I-joists.) 

Install the 

2”x2”

 L-flashing (provided)  in the corners of the 

opening to cover nail heads and provide a smooth non- 

abrasive guide-way for the lifting platform (see Fig. 2b).

 

 

LIFT OPENING WITH "I-JOIST" FABRICATED JOISTS 

 
 

 

Fig. 2a

 

 

WARNING!: TO PREVENT LIFT 

MALFUNCTION, THE OPENING 
SIDEWALLS MUST BE SMOOTH 
WITH NO PROTRUDING NAILS, 
BRACKETS, SHEETROCK, ETC. 

 

ROUGH-

IN OPENING 31 x 59”

 

THEN PANEL 4 SIDES WITH 

1/4" PLYWOOD. THE FINISHED 

OPENING SIZE IS 30.5" x 58.5" 

 

 

 

INSTALL DECKING 
FLUSH WITH OPENING 

 
 

HOLE SIDE WALLS MUST 
BE SMOOTH AND SQUARE. 

INSTALL 2 x 2” “L” FLASHING IN ALL OPENINGS:

 

2”

 x 

2”

 

“L”

 flashing is provided and should be installed 

into the corners of 

all openings

, especially those having 

exposed joist hangers. 

Any hanger brackets must be 

covered over as shown below. 

Cut the flashing to the 

finished opening height (including sheet rock and 

decking). Align it to the bottom and nail both edges with

 

INSTALL 2

X2” FLASHING

 

INSIDE FINISHED OPENING 

 

CUT SHEET ROCK 

FLUSH WITH OPENING 

 
 
 
 
 
 
 

  
Fig. 2c

 

SET NAIL HEADS FLUSH. 

 
 
 
 
 
 
 

 

WARNING!: TO PREVENT LIFT 

MALFUNCTION, THE OPENING 
SIDEWALLS MUST BE SMOOTH 
WITH NO PROTRUDING NAILS, 
BRACKETS, SHEETROCK, ETC. 

 

 

 

 

5

 

Versa Lift 

Opening Installation Specs

 

HANGER BRACKETS MUST BE COVERED 

WITH 2 x 2” FLASHING PROVIDED

 

HANGER 

HAMMER NAIL HEADS DOWN 

BRACKET 

 

COMPLETELY FLAT, 

THEN 

INSTALL THE COVER FLASHING 
(AS SHOWN IN INSET BELOW). 

 

HANGER BRACKETS MUST 

 

BE COVERED WITH 2" x 2" 

"L" SHAPED FLASHING. 

 

 

NAIL 1/4" FROM 

EACH EDGE WITH 

#17 x 1" NAILS 

CUT FLASHING TO 

OPENING HEIGHT, INCL. 

DECKING & SHEET ROCK 

Fig. 2b

 

 

 

LIFT OPENING 

IMPORTANT NOTICE

 

    ! 

WARNING 

THE LIFT OPENING MUST HAVE 

SMOOTH PERPENDICULAR SIDE WALLS. NO nail

 

heads, hanger brackets, sheet rock or decking can 
protrude or extend into the opening, as this will 
cause the lifting platform to become caught on 
those edges, causing the lift to malfunction, 
resulting in possible damage or personal injury! 
Product warranty is void if this product is installed 
on an opening that does not meet the exact 
requirements detailed on these pages. Carefully 

read the instructions detailed and illustrated in “Lift 
Opening Requirements” and “Framing Techniques” 

(Fig. 1a thru Fig. 19, pgs. 4-10).

 

Содержание 32

Страница 1: ...tent8 702 069 CONTENTS Page SafetyFacts 2 Overview 3 Electrical 4 Lift Opening Specs 4 6 Framing Techniques 7 10 Carton Contents 11 Assembly and Installation 12 19 IMPORTANT PLEASE READ YOUR OWNERS MANUAL The manual includesessential safety and maintenance information ReadmanualbeforeoperatingtheVersaLift Copyright 2006 2019 BPG All rights reserved Revised March 2019 ...

Страница 2: ......

Страница 3: ...OORING AN ATTIC SPACE If your attic is not already floored in the area where your Versa Lift will be installed then flooring material such as plywoodmustbeaddedontopoftheceilingjoiststo makeafloorthatyoucanwalkonandstoreitemson Tools Materials Required Skill Saw Hammer and Nails or Screws and Power Driver Framing Square Tape Measure and Decking Material Skill Level Handyman If you have skill with ...

Страница 4: ...PENING SPECIFICATIONS VERTICAL ATTIC SPACE The Versa Lift requires a minimum of 60 of vertical space directly over the lift opening Fig 1b OPENING DIMENSION TOLERANCES The final opening size is 30 x 58 with a tolerance of 1 2 and 0 the opening can be up to 1 2 larger but no smaller The liftopeningmustbe squareas shown below Fig 1c DiagonalAshouldequalBwithin1 2 LIFT OPENING FINISH The lift opening...

Страница 5: ...nail heads and provide a smooth non abrasiveguide wayfortheliftingplatform seeFig 2b LIFT OPENING WITH I JOIST FABRICATED JOISTS Fig 2a WARNING TO PREVENT LIFT MALFUNCTION THE OPENING SIDEWALLS MUST BE SMOOTH WITH NO PROTRUDING NAILS BRACKETS SHEETROCK ETC ROUGH IN OPENING 31 x 59 THEN PANEL 4 SIDES WITH 1 4 PLYWOOD THE FINISHED OPENING SIZE IS 30 5 x 58 5 INSTALL DECKING FLUSH WITH OPENING HOLE S...

Страница 6: ...ion structure installation or use Each user is responsible for determining the suitability appropriate location andmethodof installation forthisproduct Pleaseconsultaprofessionaltoevaluateyourceiling construction and the desired location and whether the remaining joists should be doubled to compensate for thejoist s thatwillbecut Thiswilldependonavarious factors includingthesizeandspanoftheexistin...

Страница 7: ... 5 long and install it to finish the framed opening Fig 8 Dependingonthesizeandspanofyourjoists youmay need to double the joists on either side of the opening for added strength as shown in Fig 7 The sheetrock can now be cut flush with the opening Install decking flush to the inside edge of the opening not illustrated Note that decking andsheet rock must not extend into the opening see Figs 2a 2c ...

Страница 8: ...ll need to cut two joists and install a stringer in order to get the required opening widthof31 seeFig 11 Notethe roughopeningmust be31 x59 oversize sothatitcanbepaneledwith 1 4 plywood seeFig 12 Afterpanelingthefinished opening will be 58 5 x 30 5 with smooth sidewalls Note I Joist hangers can be used instead of blocking Finish opening with 1 4 paneling to cover hangers and create a smooth sided ...

Страница 9: ...ramed oversized in each dimension to 59 x 31 Fig 15 so that 1 4 thick plywoodcanbecut Fig 16inset andusedtopanelall fourI Joistfacesinsidetheopeningtoproducethefinal size opening of 58 x 30 Fig 16 Please note that anynailheadsintheopeningmustbesetflushorbelow the surface and decking and sheet rock must not extend into the opening Fig 2a 2c on page 5 NOTE These illustrations show I Joist on 24 cent...

Страница 10: ...ide the opening Fig 19 to produce a final opening size of 58 x 30 Fig 19 Please note thatany nail headsin the opening mustbe setflush or below the surface and decking and sheet rock must not extend into the opening Fig 3 NOTE These illustrations show I Joist on 24 centers but thisframingprocedurecanalsobeusedfor16 centers page 8 As with solid wood joists I Joists thatneed to becutmustbesupportedby...

Страница 11: ......

Страница 12: ...hown but do not tighten them yet Leave them slight ly loose for leveling adjustment Step 4 2d INSTALL NYLON GUIDE SPACERS Install two nylon spacers with a 2 screw and locknut to themountingrailsinfourplaces byeachleg asshown below Tighten them snug but do not over tighten 1 4 20 TALL LOCKNUT 4 motor until this manual tells you to THE LIFT WILL MALFUNCTION IF YOU DO x 1 NYLON SPACER 8 2 x 4 Places ...

Страница 13: ...et Adjusttheshimsuntiltheheadislevel thentightenall8 leg screws Fig 24 bottom inset Remove the shims 4B INSTALL THE HOUSING LEG BRACES Installthehousinglegbraces 2 usingtheself drilling drill point screws 8 as illustrated Fig 24 inset NOTE Install the braces on the OUTSIDE surface of the housing legs NOT on the inside If braces are installed on the inside they will interfere with the lifting platf...

Страница 14: ...knuts Fig 26 Note The platform top side has warning labels Insert the plat form support into one of the left legs as shown Fig 26 inset Aligntheholeinthelegwiththeholeintheouter endof the support Nextinsert a 20 x2 screw down throughtheplatform legandsupport Fig 26 Secure screw with a short locknut but do not tighten until all fourscrewsareinstalled Whenalllegsareassembledas shown in Fig 26 tighte...

Страница 15: ...round the last stud then pass the end of the cable through the center hole in the bottom of the leg bracket Fig 30 8 5a Drawthecabletightbypullingfirmlyontheendof the cable Fig 30 IMPORTANT To avoid damaging the studs do not use a power tool to install the cable clamp nuts Use only a socket and ratchet or an end wrench 8 5b While holding tension on the cable install the cable clampwiththetophalfle...

Страница 16: ...OW CABLE CLAMP 2 1 2 x 3 8 Aluminum SPACERS 10 WARNING DO NOT Fig 30 1 4 20 TALL LOCKNUTS 10 use a power tool to install the cable clamp nuts as this can break the studs Use only a socket and ratchet or use an end wrench to tighten IMPORTANT The lifting platform must sit directly on the floor when attaching the cables Fig 29 8 2 PLACE THE LIFTING PLATFORM DIRECTLY ON THE FLOOR UNDER THE LIFT OPENI...

Страница 17: ...kofthelifthead or on either side of the lift head See Fig 33a SeeFig 33abelowforthelocationofcontrolPorts 1 2 Please note the orientation of the locking tab on the plug astheplugwillonlyinsertoneway Thelockingtabmust bedepressedwheneveryouwishtoremovetheplug For more information about the control devices safety and Lift operation please refer to the Owners Manual RECEIVER CAN MOUNT ON EITHER SIDE ...

Страница 18: ...kingasmallmark seeFig 35 11 1 Themountingrailholesareslottedforadjustment Push both mounting rails inward against the platform and move the rails and platform left or right until the platform center marks are aligned with the opening center marks 11 2 With the platform centered and the rails pressed up against each side of the platform tighten the 4 lag screwsonthefirstmountingrail butdon tover ti...

Страница 19: ...ft Read the Owners Manual before operating the Versa Lift 13 INSTALL THE STABILIZER BRACKETS Note Position the stabilizer bracket with the small hole ends against the legs and the large hole ends on the floor Withthebracketat45degreestheendsshouldbe influshcontactwithboththehousinglegsandthefloor Bend the ends slightly if needed see Fig 37 Step1 Positionthestabilizerbracketasdetailedbelow under th...

Страница 20: ...tic The lift will shut itself off when it arrives flush with the attic floor This practice allows the lift to maintain the cable around the cable drum properly insuring a trouble free operation for years to come Do Not lower the lift onto a box workbench pickup bed or at waist knee height to unload This can cause the cable to wind up backwards creating an issue with the cable around the drum Put y...

Отзывы: