Opening Installation Specs

 

 

 

ELECTRICAL REQUIREMENTS:

 

ELECTRICAL OUTLET:

 

You will need a single 120 volt AC grounded electrical 

outlet to plug in the Versa Lift power cord. It is highly 

recommended that the outlet be on the same switched 

circuit as the lighting in your attic so that when the attic 

lights are turned off, the power to the Versa Lift is also 

turned off. This arrangement will be more convenient for 

you and will prevent unintended operation of the lift.

 

 

The power cord provided with this product has three blades. 

The longest blade is the grounding blade (Fig. 1a). The 

shorter flat blades are the current carrying blades. You will 

need a grounded power outlet (receptacle) as shown below 

(Fig. 1a). If your outlet does not have a grounded receptacle 

for a three blade plug or if you are unsure if your outlet is 

correctly grounded, have a qualified electrician check the 

outlet (receptacle) to make sure it meets local codes.

 

Incorrect grounding puts you at risk of electrical shock. 

Never modify the equipment plug to fit a two blade outlet 
(receptacle)!

 

If you use an extension cord, it must be a heavy duty three- 

wire type with a three blade grounding plug and matching 

grounded outlet (receptacle) like those shown in Fig. 1a 

and rated for at least twice the load (10 amps minimum).

 

LIFT OPENING SPECIFICATIONS:

 

VERTICAL ATTIC SPACE:

 

The Versa Lift requires a minimum of 

60”

 of vertical space 

directly over the lift opening (Fig. 1b).

 

OPENING DIMENSION & TOLERANCES:

 

The final opening size is 

30½”

 x 

58½”

 with a tolerance of

 

+1/2”

 and -

0”

 (the opening can be up to 

1/2”

 larger, but 

no smaller.) The lift opening must be square as shown 

below (Fig. 1c). Diagonal A should equal B within 

1/2”.

 

LIFT OPENING FINISH:

 

The lift opening must have smooth, perpendicular side 

walls. 

No nail  heads,  brackets,  sheet  rock  or  decking  

can protrude or extend into the opening, 

as  this  will 

cause the lifting platform to become caught on those 

edges and the lift will malfunction. (See Figs. 2a, b, & c).

 

 

 

 

120VAC GROUNDED POWER OUTLET 

 

     CURRENT 

CARRYING 
BLADES 

 
 
 
 
 
 

GROUNDING  BLADE 

IS THE LONGEST OF 
THE THREE BLADES 

Fig. 1a

 

 

 
 

 

7.75”

 

11" 

 

MOTOR PROJECTS  

58”

 

11”

 ON ONE END! 

30° 

 

32.5" 

60”

 

MIN. 

38.5" 

LIFT OPENING 

REQUIRES 60” MIN. 

OF VERTICAL SPACE 

Fig. 1b

 

 

LIFT OPENING MUST BE SQUARE (A = B ± 

1/2”)

 

 

90° 

90° 

 

DIM. 

DIM. 

"A" 

"B" 

 
 

58.5" 

 
 
 
 
 

90° 

90° 

 

 

30.5" 

Fig. 1c

 

 

 

control transmitter or from another transmitter 
in your area. Unintended operation can cause 
the lifting platform to move unexpectedly, 
possibly causing injury to persons or damage  
to property located directly under the  lift.

 

!

 

    ! 

WARNING 

To prevent unintended lift operation, 

 you must turn the power switch off, unplug the power  
cord, or disconnect the power when not in use!  The 
wireless model radio is active if the lift has power and 
is turned on and can operate the lift whenever a  
coded signal is received from the VersaLift remote 
 
 
 
 
 
 
 
 
 
 

Содержание 32

Страница 1: ...tent8 702 069 CONTENTS Page SafetyFacts 2 Overview 3 Electrical 4 Lift Opening Specs 4 6 Framing Techniques 7 10 Carton Contents 11 Assembly and Installation 12 19 IMPORTANT PLEASE READ YOUR OWNERS MANUAL The manual includesessential safety and maintenance information ReadmanualbeforeoperatingtheVersaLift Copyright 2006 2019 BPG All rights reserved Revised March 2019 ...

Страница 2: ......

Страница 3: ...OORING AN ATTIC SPACE If your attic is not already floored in the area where your Versa Lift will be installed then flooring material such as plywoodmustbeaddedontopoftheceilingjoiststo makeafloorthatyoucanwalkonandstoreitemson Tools Materials Required Skill Saw Hammer and Nails or Screws and Power Driver Framing Square Tape Measure and Decking Material Skill Level Handyman If you have skill with ...

Страница 4: ...PENING SPECIFICATIONS VERTICAL ATTIC SPACE The Versa Lift requires a minimum of 60 of vertical space directly over the lift opening Fig 1b OPENING DIMENSION TOLERANCES The final opening size is 30 x 58 with a tolerance of 1 2 and 0 the opening can be up to 1 2 larger but no smaller The liftopeningmustbe squareas shown below Fig 1c DiagonalAshouldequalBwithin1 2 LIFT OPENING FINISH The lift opening...

Страница 5: ...nail heads and provide a smooth non abrasiveguide wayfortheliftingplatform seeFig 2b LIFT OPENING WITH I JOIST FABRICATED JOISTS Fig 2a WARNING TO PREVENT LIFT MALFUNCTION THE OPENING SIDEWALLS MUST BE SMOOTH WITH NO PROTRUDING NAILS BRACKETS SHEETROCK ETC ROUGH IN OPENING 31 x 59 THEN PANEL 4 SIDES WITH 1 4 PLYWOOD THE FINISHED OPENING SIZE IS 30 5 x 58 5 INSTALL DECKING FLUSH WITH OPENING HOLE S...

Страница 6: ...ion structure installation or use Each user is responsible for determining the suitability appropriate location andmethodof installation forthisproduct Pleaseconsultaprofessionaltoevaluateyourceiling construction and the desired location and whether the remaining joists should be doubled to compensate for thejoist s thatwillbecut Thiswilldependonavarious factors includingthesizeandspanoftheexistin...

Страница 7: ... 5 long and install it to finish the framed opening Fig 8 Dependingonthesizeandspanofyourjoists youmay need to double the joists on either side of the opening for added strength as shown in Fig 7 The sheetrock can now be cut flush with the opening Install decking flush to the inside edge of the opening not illustrated Note that decking andsheet rock must not extend into the opening see Figs 2a 2c ...

Страница 8: ...ll need to cut two joists and install a stringer in order to get the required opening widthof31 seeFig 11 Notethe roughopeningmust be31 x59 oversize sothatitcanbepaneledwith 1 4 plywood seeFig 12 Afterpanelingthefinished opening will be 58 5 x 30 5 with smooth sidewalls Note I Joist hangers can be used instead of blocking Finish opening with 1 4 paneling to cover hangers and create a smooth sided ...

Страница 9: ...ramed oversized in each dimension to 59 x 31 Fig 15 so that 1 4 thick plywoodcanbecut Fig 16inset andusedtopanelall fourI Joistfacesinsidetheopeningtoproducethefinal size opening of 58 x 30 Fig 16 Please note that anynailheadsintheopeningmustbesetflushorbelow the surface and decking and sheet rock must not extend into the opening Fig 2a 2c on page 5 NOTE These illustrations show I Joist on 24 cent...

Страница 10: ...ide the opening Fig 19 to produce a final opening size of 58 x 30 Fig 19 Please note thatany nail headsin the opening mustbe setflush or below the surface and decking and sheet rock must not extend into the opening Fig 3 NOTE These illustrations show I Joist on 24 centers but thisframingprocedurecanalsobeusedfor16 centers page 8 As with solid wood joists I Joists thatneed to becutmustbesupportedby...

Страница 11: ......

Страница 12: ...hown but do not tighten them yet Leave them slight ly loose for leveling adjustment Step 4 2d INSTALL NYLON GUIDE SPACERS Install two nylon spacers with a 2 screw and locknut to themountingrailsinfourplaces byeachleg asshown below Tighten them snug but do not over tighten 1 4 20 TALL LOCKNUT 4 motor until this manual tells you to THE LIFT WILL MALFUNCTION IF YOU DO x 1 NYLON SPACER 8 2 x 4 Places ...

Страница 13: ...et Adjusttheshimsuntiltheheadislevel thentightenall8 leg screws Fig 24 bottom inset Remove the shims 4B INSTALL THE HOUSING LEG BRACES Installthehousinglegbraces 2 usingtheself drilling drill point screws 8 as illustrated Fig 24 inset NOTE Install the braces on the OUTSIDE surface of the housing legs NOT on the inside If braces are installed on the inside they will interfere with the lifting platf...

Страница 14: ...knuts Fig 26 Note The platform top side has warning labels Insert the plat form support into one of the left legs as shown Fig 26 inset Aligntheholeinthelegwiththeholeintheouter endof the support Nextinsert a 20 x2 screw down throughtheplatform legandsupport Fig 26 Secure screw with a short locknut but do not tighten until all fourscrewsareinstalled Whenalllegsareassembledas shown in Fig 26 tighte...

Страница 15: ...round the last stud then pass the end of the cable through the center hole in the bottom of the leg bracket Fig 30 8 5a Drawthecabletightbypullingfirmlyontheendof the cable Fig 30 IMPORTANT To avoid damaging the studs do not use a power tool to install the cable clamp nuts Use only a socket and ratchet or an end wrench 8 5b While holding tension on the cable install the cable clampwiththetophalfle...

Страница 16: ...OW CABLE CLAMP 2 1 2 x 3 8 Aluminum SPACERS 10 WARNING DO NOT Fig 30 1 4 20 TALL LOCKNUTS 10 use a power tool to install the cable clamp nuts as this can break the studs Use only a socket and ratchet or use an end wrench to tighten IMPORTANT The lifting platform must sit directly on the floor when attaching the cables Fig 29 8 2 PLACE THE LIFTING PLATFORM DIRECTLY ON THE FLOOR UNDER THE LIFT OPENI...

Страница 17: ...kofthelifthead or on either side of the lift head See Fig 33a SeeFig 33abelowforthelocationofcontrolPorts 1 2 Please note the orientation of the locking tab on the plug astheplugwillonlyinsertoneway Thelockingtabmust bedepressedwheneveryouwishtoremovetheplug For more information about the control devices safety and Lift operation please refer to the Owners Manual RECEIVER CAN MOUNT ON EITHER SIDE ...

Страница 18: ...kingasmallmark seeFig 35 11 1 Themountingrailholesareslottedforadjustment Push both mounting rails inward against the platform and move the rails and platform left or right until the platform center marks are aligned with the opening center marks 11 2 With the platform centered and the rails pressed up against each side of the platform tighten the 4 lag screwsonthefirstmountingrail butdon tover ti...

Страница 19: ...ft Read the Owners Manual before operating the Versa Lift 13 INSTALL THE STABILIZER BRACKETS Note Position the stabilizer bracket with the small hole ends against the legs and the large hole ends on the floor Withthebracketat45degreestheendsshouldbe influshcontactwithboththehousinglegsandthefloor Bend the ends slightly if needed see Fig 37 Step1 Positionthestabilizerbracketasdetailedbelow under th...

Страница 20: ...tic The lift will shut itself off when it arrives flush with the attic floor This practice allows the lift to maintain the cable around the cable drum properly insuring a trouble free operation for years to come Do Not lower the lift onto a box workbench pickup bed or at waist knee height to unload This can cause the cable to wind up backwards creating an issue with the cable around the drum Put y...

Отзывы: