Opening Framing Techniques

 

 

 

Optional Framing Technique #4 - For existing homes 
with I-JOISTS: (How to Fabricate Headers for I-Joists)

 

The procedure is generally the same as with I-Joists on 

the prior page, but when the home is a finished 

construction (already built and owned) you may not have 

extra I-Joist pieces from which to construct headers. First 

you should check with local building supplies, but if you 

can’t

 find the same size I-Joists used to build your home 

you may need a way to 

construct headers from other 

available material.

 

One way to address this problem is to construct headers 

from 

3/4”

 plywood and 2 x 

2”

 rails (Fig. 17). Join the rails 

to the plywood with wood glue and nails or screws.

 

Then attach offset blocking (Fig. 17) as previously 

explained on page 9. Headers constructed this way will 

have good strength and have the advantage of a smooth 

face toward the opening. NOTE: The blocking is attached 

flush with the ends 

of the I-Joist Section when using 

constructed headers with a flat inside surface (Fig. 17).

 

The opening must be framed 

½”oversized

 in only one 

dimension (58 ½” x 31”) (Fig. 18), so that 1/4” thick 

plywood can be cut (Fig. 19 inset) and used to panel the 

two I-Joist faces inside the opening (Fig. 19) to produce a 

final opening size of 58 

½”

 x 30 

½”

 (Fig. 19). Please note 

that any nail heads in the opening must be set flush or 

below the surface and decking and sheet rock must not 

extend into the opening (Fig. 3).

 

NOTE: These illustrations show I-Joist on 

24”

 centers, but 

this framing procedure can also be used for 

16”

 centers 

(page 8). As with solid wood joists, I-Joists that need to 

be cut must be supported by some means until they are 

connected to headers that tie them to adjacent I-Joists.

 

 

Note: Joist hangers can be used instead of blocking. 

Finish opening with 1/4” paneling to cover hangers 

and create a smooth-sided opening (Fig. 19, then 

install 2 x 2” flashing in every corner (Fig.

 2b, pg. 5).

 

 

 

 
 
 
 
 
 
 

 

 

 

 
 
 
 
 
 

 

O.C. 

 
 

CUT 1/4" PLYWOOD TO 

PANEL INSIDE OF I-JOISTS 

 

ST 

 

Depending on location 

and code requirements, 

web stiffeners may be 

required for I-Joist when 

using hanger brackets.

 

 

 
 
 
 

 
 
 

Web Stiffener

 

I-Joist 

Hanger

 

 
 
 

58.5" 

 
 
 
 

 

30.5" 

 
 

 

24” 

O.C. 

31”

 

58.5" 

24”

 

Fig. 19

 

Fig. 18

 

INSTALL 2 x 2” FLASHING 

INSIDE FINISHED OPENING 

 

 

2x4"or2x6" 
BLOCKING 
(OFFSET) 

2x4"or2x6" 

BLOCKING 
(SET FLUSH) 

 

I-JOIST 

SECTION 

 
 
 
 

WOOD 

GLUE 

 

PLYWOOD 

CONSTRUCTED 

HEADERS 

½ or 3/4" 

PLYWOOD 

 

2x4"or2x6" 

BLOCKING 
(OFFSET) 

2x2" 

2 x 2" TOP & BOTTOM RAILS 
GLUE AND NAIL TO PLYWOOD 

 

I-JOIST 

PLYWOOD HEADER 

 

         

BLOCK 

USE 2" NAILS 

 

or SCREWS 

 

 

PLACE BLOCK 

USE 2" NAILS 

 

INTO INSET TO 

or SCREWS 

 

MARK OFFSET 

WOOD 

 

GLUE 

Fig. 17

 

 

INSET 

OFFSET 

OFFSET LINE 

 

2 EACH 

JOI 

  

581/4"   

 

 

 

Содержание 32

Страница 1: ...tent8 702 069 CONTENTS Page SafetyFacts 2 Overview 3 Electrical 4 Lift Opening Specs 4 6 Framing Techniques 7 10 Carton Contents 11 Assembly and Installation 12 19 IMPORTANT PLEASE READ YOUR OWNERS MANUAL The manual includesessential safety and maintenance information ReadmanualbeforeoperatingtheVersaLift Copyright 2006 2019 BPG All rights reserved Revised March 2019 ...

Страница 2: ......

Страница 3: ...OORING AN ATTIC SPACE If your attic is not already floored in the area where your Versa Lift will be installed then flooring material such as plywoodmustbeaddedontopoftheceilingjoiststo makeafloorthatyoucanwalkonandstoreitemson Tools Materials Required Skill Saw Hammer and Nails or Screws and Power Driver Framing Square Tape Measure and Decking Material Skill Level Handyman If you have skill with ...

Страница 4: ...PENING SPECIFICATIONS VERTICAL ATTIC SPACE The Versa Lift requires a minimum of 60 of vertical space directly over the lift opening Fig 1b OPENING DIMENSION TOLERANCES The final opening size is 30 x 58 with a tolerance of 1 2 and 0 the opening can be up to 1 2 larger but no smaller The liftopeningmustbe squareas shown below Fig 1c DiagonalAshouldequalBwithin1 2 LIFT OPENING FINISH The lift opening...

Страница 5: ...nail heads and provide a smooth non abrasiveguide wayfortheliftingplatform seeFig 2b LIFT OPENING WITH I JOIST FABRICATED JOISTS Fig 2a WARNING TO PREVENT LIFT MALFUNCTION THE OPENING SIDEWALLS MUST BE SMOOTH WITH NO PROTRUDING NAILS BRACKETS SHEETROCK ETC ROUGH IN OPENING 31 x 59 THEN PANEL 4 SIDES WITH 1 4 PLYWOOD THE FINISHED OPENING SIZE IS 30 5 x 58 5 INSTALL DECKING FLUSH WITH OPENING HOLE S...

Страница 6: ...ion structure installation or use Each user is responsible for determining the suitability appropriate location andmethodof installation forthisproduct Pleaseconsultaprofessionaltoevaluateyourceiling construction and the desired location and whether the remaining joists should be doubled to compensate for thejoist s thatwillbecut Thiswilldependonavarious factors includingthesizeandspanoftheexistin...

Страница 7: ... 5 long and install it to finish the framed opening Fig 8 Dependingonthesizeandspanofyourjoists youmay need to double the joists on either side of the opening for added strength as shown in Fig 7 The sheetrock can now be cut flush with the opening Install decking flush to the inside edge of the opening not illustrated Note that decking andsheet rock must not extend into the opening see Figs 2a 2c ...

Страница 8: ...ll need to cut two joists and install a stringer in order to get the required opening widthof31 seeFig 11 Notethe roughopeningmust be31 x59 oversize sothatitcanbepaneledwith 1 4 plywood seeFig 12 Afterpanelingthefinished opening will be 58 5 x 30 5 with smooth sidewalls Note I Joist hangers can be used instead of blocking Finish opening with 1 4 paneling to cover hangers and create a smooth sided ...

Страница 9: ...ramed oversized in each dimension to 59 x 31 Fig 15 so that 1 4 thick plywoodcanbecut Fig 16inset andusedtopanelall fourI Joistfacesinsidetheopeningtoproducethefinal size opening of 58 x 30 Fig 16 Please note that anynailheadsintheopeningmustbesetflushorbelow the surface and decking and sheet rock must not extend into the opening Fig 2a 2c on page 5 NOTE These illustrations show I Joist on 24 cent...

Страница 10: ...ide the opening Fig 19 to produce a final opening size of 58 x 30 Fig 19 Please note thatany nail headsin the opening mustbe setflush or below the surface and decking and sheet rock must not extend into the opening Fig 3 NOTE These illustrations show I Joist on 24 centers but thisframingprocedurecanalsobeusedfor16 centers page 8 As with solid wood joists I Joists thatneed to becutmustbesupportedby...

Страница 11: ......

Страница 12: ...hown but do not tighten them yet Leave them slight ly loose for leveling adjustment Step 4 2d INSTALL NYLON GUIDE SPACERS Install two nylon spacers with a 2 screw and locknut to themountingrailsinfourplaces byeachleg asshown below Tighten them snug but do not over tighten 1 4 20 TALL LOCKNUT 4 motor until this manual tells you to THE LIFT WILL MALFUNCTION IF YOU DO x 1 NYLON SPACER 8 2 x 4 Places ...

Страница 13: ...et Adjusttheshimsuntiltheheadislevel thentightenall8 leg screws Fig 24 bottom inset Remove the shims 4B INSTALL THE HOUSING LEG BRACES Installthehousinglegbraces 2 usingtheself drilling drill point screws 8 as illustrated Fig 24 inset NOTE Install the braces on the OUTSIDE surface of the housing legs NOT on the inside If braces are installed on the inside they will interfere with the lifting platf...

Страница 14: ...knuts Fig 26 Note The platform top side has warning labels Insert the plat form support into one of the left legs as shown Fig 26 inset Aligntheholeinthelegwiththeholeintheouter endof the support Nextinsert a 20 x2 screw down throughtheplatform legandsupport Fig 26 Secure screw with a short locknut but do not tighten until all fourscrewsareinstalled Whenalllegsareassembledas shown in Fig 26 tighte...

Страница 15: ...round the last stud then pass the end of the cable through the center hole in the bottom of the leg bracket Fig 30 8 5a Drawthecabletightbypullingfirmlyontheendof the cable Fig 30 IMPORTANT To avoid damaging the studs do not use a power tool to install the cable clamp nuts Use only a socket and ratchet or an end wrench 8 5b While holding tension on the cable install the cable clampwiththetophalfle...

Страница 16: ...OW CABLE CLAMP 2 1 2 x 3 8 Aluminum SPACERS 10 WARNING DO NOT Fig 30 1 4 20 TALL LOCKNUTS 10 use a power tool to install the cable clamp nuts as this can break the studs Use only a socket and ratchet or use an end wrench to tighten IMPORTANT The lifting platform must sit directly on the floor when attaching the cables Fig 29 8 2 PLACE THE LIFTING PLATFORM DIRECTLY ON THE FLOOR UNDER THE LIFT OPENI...

Страница 17: ...kofthelifthead or on either side of the lift head See Fig 33a SeeFig 33abelowforthelocationofcontrolPorts 1 2 Please note the orientation of the locking tab on the plug astheplugwillonlyinsertoneway Thelockingtabmust bedepressedwheneveryouwishtoremovetheplug For more information about the control devices safety and Lift operation please refer to the Owners Manual RECEIVER CAN MOUNT ON EITHER SIDE ...

Страница 18: ...kingasmallmark seeFig 35 11 1 Themountingrailholesareslottedforadjustment Push both mounting rails inward against the platform and move the rails and platform left or right until the platform center marks are aligned with the opening center marks 11 2 With the platform centered and the rails pressed up against each side of the platform tighten the 4 lag screwsonthefirstmountingrail butdon tover ti...

Страница 19: ...ft Read the Owners Manual before operating the Versa Lift 13 INSTALL THE STABILIZER BRACKETS Note Position the stabilizer bracket with the small hole ends against the legs and the large hole ends on the floor Withthebracketat45degreestheendsshouldbe influshcontactwithboththehousinglegsandthefloor Bend the ends slightly if needed see Fig 37 Step1 Positionthestabilizerbracketasdetailedbelow under th...

Страница 20: ...tic The lift will shut itself off when it arrives flush with the attic floor This practice allows the lift to maintain the cable around the cable drum properly insuring a trouble free operation for years to come Do Not lower the lift onto a box workbench pickup bed or at waist knee height to unload This can cause the cable to wind up backwards creating an issue with the cable around the drum Put y...

Отзывы: