background image

20306757

35

CSDV Series Direct Vent Gas Stove

REPLACEMENT PARTS

 

Ref. Description 

Qty. 

CSDV30NV  CSDV30PV

  1.  Burner Assembly 

58D0150 

58D0150

  2.  Log Support Bracket 

58D0024 

58D0024

  3.  Pilot Assembly 

37D0018 

37D0019

  4.  SIT 820 Nova Valve 

37D0117 

37D0118

 5.  Injector 

58D0102 

20H3144

 6.  Venturi 

45D0600 

45D0600

  7.  Valve Tube 

58D0163 

58D0163

  8.  ON/OFF Rocker Switch 

41D0048 

41D0048

  9.  Ceramic Glass 

58D0028 

58D0028

  10.  Air Shutter Rod 

58D0048 

58D0048

  11.  Air Shutter Knob 

45D0237 

45D0237

  12.  Knob Extension Hi/Lo 

43D0095 

43D0095

  13.  Knob Extension ON/OFF 

43D0094 

43D0094

  14.  Ignitor Battery Module 

45D0077 

45D0077

  15.  Ignitor Wire Harness 

45D0500 

45D0500

  16.  ON/OFF Wire Harness 

45D0501 

45D0501

  17.  Burner Tube 

58D0164 

58D0164

  18.  Rear Log 

58D1941 

58D1941

  19.  Right Bottom Log 

58D1943 

58D1943

  20.  Right Top Log 

58D1945 

58D1945

  21.  Left Top Log 

58D1944 

58D1944

  22.  Left Bottom Log 

58D1942 

58D1942

  23.  Vertical Restrictor (not shown) 

45D0551 

45D0551

  24.  Engine Gasket Set (not shown) 

58D0194 

58D0194

  25.  Front Grate (not shown) 

56D0062 

56D0062

  26.  Safety Barrier 

30007258 

30007258

ACCESSORIES

Thermostat Blower - MODEL #BLOTCS 

Содержание CSDV30NVEMBCSB

Страница 1: ...Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department Installation and service must be perfor...

Страница 2: ...tems Needed 22 Check Gas Pressure 23 CONGRATULATIONS You have purchased a state of the art gas appliance featuring the Lex Fire Burn System available exclusively on Vermont Castings Group The Lex Fire...

Страница 3: ...alled by a qualified service person The glass door must be properly seated and sealed If this unit is not properly installed by a qualified service person with glass door properly seated and sealed co...

Страница 4: ...replacement of the unit 19 Do not operate stove if any log is broken 20 Do not use a blower insert heat exchanger insert or other accessory not approved for use with this stove 21 Do not operate the...

Страница 5: ...DV Cast Iron Stove Controls ON OF F FP2724 CSDV controls Pilot Optional Remote Receiver Door Hi Lo Knob On Off Switch Optional Blower Ignitor Box Located Under Right Front Leg HIGH ELEVATIONS Input ra...

Страница 6: ...6 20306757 CSDV Series Direct Vent Gas Stove STOVE DIMENSIONS Figure 2 Stove Dimensions 586056 CSDV dims 261 2 673 mm 21 533 mm 281 2 724 mm...

Страница 7: ...ts Locate the stove where it can be accessed by a gas supply line Locate the stove in a large and open room that is centrally located in the house This will optimize heat circulation and comfort The f...

Страница 8: ...ll be installed on a metal wood or noncombustible material panel extending full width and depth of the appliance A E Minimum D Minimum to Either Side Wall ST1128 sidewall clearance Ceiling Mantel Side...

Страница 9: ...F A C B ST1132 alcove clearances Figure 5 Alcove Clearances NOTE Maintain minimum side and back clearances when placing stove in alcove ALCOVE CLEARANCES ALCOVE MINIMUM DIMENSIONS Height from Hearth W...

Страница 10: ...from inside of unit 7 Lift unit off pallet Lift unit up high enough to clear upright supports unit is sitting on NOTE You will need at least two 2 strong people to lift unit off of pallet UNPACKING ON...

Страница 11: ...outside The venting system must NEVER be attached to a chimney serving a separate solid fuel burning appliance Each gas appliance must use a separate vent system Do not use common vent systems WARNIN...

Страница 12: ...s Minimum clearance between vent pipes and combustible materials such as insulation is 1 WARNING Never run the vent pipe level or downward This may cause excessive temperatures which could cause a fir...

Страница 13: ...for appliances 100 000 BTU h 30kW 6 15cm for appliances 10 000 BTU h 3kW 9 23cm for appliances 10 000 BTU h 3kW and 50 000 BTU h 15kW 12 30cm for appliances 50 000 BTU h 15kW C Clearance to permanentl...

Страница 14: ...stible Noncombustible 12 305 mm M Balcony with perpendicular side wall M 12 305 mm P 6 152 mm M F Alcove Applications C D C E V V Combustible Noncombustible E Min 2 51 mm for non vinyl sidewalls Min 1...

Страница 15: ...male end of adjacent pipes and fittings Push the pipe sections together and twist one section clockwise approximately one quarter turn until the sections are fully locked Figure 14 FP1953 rigid pipe...

Страница 16: ...vent pipe before con necting the horizontal run to the vent cap Figure 18 6 Carefully move the stove with vent assembly attached toward the wall and insert the vent pipe into the hori zontal terminat...

Страница 17: ...tention to these installation instructions for required clearances air space to combustibles when passing through ceilings walls roofs enclosures attic rafters etc Do not pack air spaces with insulati...

Страница 18: ...ole must be measured on the horizontal Actual length may be larger depending on the pitch of the roof There must be a 1 minimum clearance from the vent pipe to combustible materials Frame the opening...

Страница 19: ...al ceiling installations can be very tricky 1 Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box Mark the outline of the cathedral ceiling support box...

Страница 20: ...gure 27 Vertical Rigid Venting Configuration using Three 3 90 Elbows with Two 2 Horizontal Runs H V V1 ST1146 vert vent 2 elbows NOTE Install restrictor into 4 collar of stove or first vent section as...

Страница 21: ...Number Description 902B 65 8 x 48 Pipe 903B 65 8 x 36 Pipe 904B 65 8 x 24 Pipe 906B 65 8 x 12 Pipe 907b 65 8 x 9 Pipe 908B 65 8 x 6 Pipe 911B 65 8 Adjustable 11 145 8 Pipe 940 Wall Thimble 941 Cathed...

Страница 22: ...regulator The external regulator will reduce incoming gas pressure You must reduce incoming gas pressure to between 11 and 13 inches of water If you do not reduce incoming gas pressure burner system r...

Страница 23: ...t you install a sediment trap drip leg in supply line as shown in Figure 31 Locate sediment trap drip leg where it is within reach for cleaning Install in piping system between fuel supply and burner...

Страница 24: ...ational Electrical Code ANSI NFPA 70 latest edition and Canadian Electrical Code CSA C22 1 CAUTION Label all wires before disconnecting when servicing controls Wiring errors can cause improper and dan...

Страница 25: ...ins against left side of firebox 5 Place right base log 3 on the two pins against right side of firebox 6 Place top left log 4 on left base log Line up the notch in the bottom of the top log with the...

Страница 26: ...REN TO TOUCH GLASS A barrier designed to reduce the risk of burns from the hot viewing glass is provided with this appliance and shall be installed for the protection of children and other at risk ind...

Страница 27: ...neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department C Use only your hand to push in or turn the gas control knob Never use tools If t...

Страница 28: ...urner connections Field made joints gas shutoff valve Pilot Factory made joints Each joint or connection All joints on valve and control body 1 Depress and turn knob counterclockwise to pilot position...

Страница 29: ...on is in the ON position to light the main burner LIGHTING THE BURNER Depress and turn the knob counterclockwise to the ON position It will take less than four 4 seconds for the burner to ignite PILOT...

Страница 30: ...high altitude as follows To increase air mixture pull down the adjustment rod located beneath the stove This opens the shutter more and will stop sooting Figure 37 To decrease air mixture push up the...

Страница 31: ...n the door Do not use abrasive cleaners They will damage the glass surface PILOT AND BURNER FLAMES Visually check pilot and burner flames periodically Refer to Figure 42 for typical pilot flame Refer...

Страница 32: ...s pane with tadpole gasket Make sure you have 1 4 overlap on each side 7 Place new glass in frame 8 Slide glass frame back down onto stove and fasten two clamps Figure 41 9 Insert front into the top o...

Страница 33: ...Adjust and retighten Pilot will not stay lit 1 Defective thermocouple Loose thermocouple 2 Air in gas line 3 No gas 1 Check for proper connection of thermocouple to rear of valve 2 Bleed line Contact...

Страница 34: ...9 20 21 22 17 3 4 13 12 16 5 11 2 15 1 14 6 10 8 7 9 586056 CSDV30 parts 26 WARNING Failure to position the parts in accordance with these diagrams or failure to use only parts specifically approved w...

Страница 35: ...Knob 1 45D0237 45D0237 12 Knob Extension Hi Lo 1 43D0095 43D0095 13 Knob Extension ON OFF 1 43D0094 43D0094 14 Ignitor Battery Module 1 45D0077 45D0077 15 Ignitor Wire Harness 1 45D0500 45D0500 16 ON...

Страница 36: ...ys to comply with the above requirements provided however that during said thirty 30 day period a battery operated carbon monoxide detector with an alarm shall be installed MASSACHUSETTS RESIDENTS ONL...

Страница 37: ...tion damage damage from unauthorized service incidental or consequential damage or negative pressure caused by mechanical systems such as furnaces fans clothes dryers etc TERMS This warranty shall be...

Страница 38: ......

Страница 39: ......

Страница 40: ...rchez dans la brochure les caract ristique de rendement nerg tique de foyer au gaz nerguide Selon CSA P 4 1 09 EFFICIENCY RATINGS Model EnerGuide Ratings Fire place Efficiency D O E AFUE CSDV30NV 65 4...

Отзывы: