50-24 Operating the Vacuum Excavator
V25/VX30G/VSK25/VSK30G Vacuum Excavators
Step 10:
(Option)
Open Tank Cleanout valve
(8)
to turn on automatic tank cleanout
system. Material will be washed out of spoil tank. Close Tank Cleanout valve
when tank is clean.
Step 11:
Close Hose Reel ball valve. Turn
Water Pump Switch
OFF.
Step 12:
Squeeze spray wand trigger to release water pressure from water hose.
Step 13:
Remove and store safety bar and safety lock pin.
Step 14:
Lower spoil tank. Close and lock spoil tank door.
Lower engine speed to idle.
Step 15:
, and remove ignition key.
Step 16:
Clean Cyclone Separator as directed in the following section.
Step 17:
Clean tools and hoses as directed in “Tools and Hoses - Clean,”
Step 18:
Securely store all tools and hoses prior to departing.
Cyclone Separator Housing - Clean
Open and clean cyclone separator housing
(1)
after dumping the spoil tank. Wipe
housing clean with a towel. Do not spray water into the housing while the engine is
running.
8
1
Содержание McLaughlin V25
Страница 8: ...This page intentionally left blank...
Страница 26: ...This page intentionally left blank...
Страница 28: ...This page intentionally left blank...
Страница 44: ...This page intentionally left blank...
Страница 50: ...This page intentionally left blank...
Страница 82: ...This page intentionally left blank...
Страница 122: ...This page intentionally left blank...
Страница 124: ...This page intentionally left blank...
Страница 136: ...This page intentionally left blank...
Страница 140: ...This page intentionally left blank...
Страница 144: ...This page intentionally left blank...
Страница 152: ...This page intentionally left blank...
Страница 156: ...This page intentionally left blank...
Страница 168: ...This page intentionally left blank...
Страница 176: ...This page intentionally left blank...