EUROBLOC
GENERAL OVERHAUL INSTRUCTIONS
32/69
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
09/2016
8.5.1 Construction of rope guide (newer model) for hoist frame size: VT3
1. Rope guide
2. Roller spring
3. Pressure roller
4. Connector rod for end flanges of hoisting machinery (drum flange connector rod)
Replace the rope guide if:
Inspection method:
The rope guide does not work properly.
Visual/Operational testing. See the rope guide in
operation. Look for smooth moving without any binding.
Verify that the roller is applying enough pressure to
guide the rope into the grooves of the drum smoothly
and tightly.
Check that the connector rod is not bent or damaged in
some other way.
TO ORDER: a rope guide: See Spare Part Catalogue
8.5.2 Construction of rope guide for hoist frame size: VT4, VT5 (Models before 12.2006)