Table 3-2
Compute node FC ports
Compute node FC ports
Slot 1; ports 1 and 2
Slot 4; ports 1 and 2
XX
XX
XX
XX
A
B
Ch1 Ch2
Ch1 Ch2
Table 3-3
Primary Shelf FC ports
Primary Storage Shelf FC ports
Canister A; FC Ch1 and FC Ch2
Canister B; FC Ch1 and FC Ch2
To connect the compute node to the Primary Storage Shelf
1
Connect the slot 1 FC ports on the compute node to the appropriate Primary
Storage Shelf canister FC ports as follows:
■
Connect compute node slot 1, port 2 to Primary Shelf canister B, FC Ch1
■
Connect compute node slot 1, port 1 to Primary Shelf canister A, FC Ch1
2
Connect the slot 4 FC ports on the compute node to the appropriate Primary
Storage Shelf canister FC ports as follows:
■
Connect compute node slot 4, port 2 to Primary Shelf canister B, FC Ch2
42
Installation procedures
Connecting the Velocity 7330 compute node to the Primary Storage Shelf