Table 2-1
Veritas Velocity 7330 Appliance hardware installation
requirements
(continued)
Task
Step
Verify that all of the package contents are present. If any of the listed
items are not present, contact your vendor for assistance.
See
on page 22.
Step 3
Determine the rack locations for the appliance.
See
“Determining the rack location”
on page 23.
Step 4
Required personnel and equipment for appliance
hardware installation
The following items are required at the installation site:
■
At least two people or a mechanical lift to move the storage shelves
■
A keyboard and a monitor to connect to the compute node for IPMI port
configuration
■
Ethernet cables to connect the compute node to your corporate network
■
A 19-inch rack with dual power distribution units (PDUs)
■
120VAC or 220VAC power supply for the compute node
■
220VAC power supply for the Primary Storage Shelf
Package contents
The Velocity 7330 Appliance compute node and storage shelf are shipped in
separate containers that each contain the necessary installation equipment and
other materials. The disk drives for the storage shelves are shipped in additional
containers.
lists the contents of the shipping containers. Verify that all of items are
present after you unpack each container.
22
Preinstallation requirements
Required personnel and equipment for appliance hardware installation