![Verint Nextiva S1100 Скачать руководство пользователя страница 77](http://html1.mh-extra.com/html/verint/nextiva-s1100/nextiva-s1100_user-manual_1004473077.webp)
Verint Video Intelligence Solutions
65
Nextiva S1100 User Guide
c. To see the progress of the operation, press Enter every second.
The site survey is completed when the value of Current SCF Connection Status
returns to Connected to X Clients and Y Slaves, after having gone to Site
survey (100% completed).
d. Execute the Visualize Last Site Survey Report command.
e. Check that the MasterB name is listed as the Unit Name of one of the channels. You
may need to scroll up the CLI window to see the beginning of the survey data.
For example, in the following site survey, MasterB has a visual connection with the
MasterA device. If the MasterB name is not displayed in the site survey, it means
that the two masters cannot see each other.
Содержание Nextiva S1100
Страница 1: ...Nextiva S1100 User Guide Firmware Release 4 12 October 2007...
Страница 2: ......
Страница 3: ...Nextiva S1100 Firmware Release 4 12 User Guide Verint Video Intelligence Solutions Revision B...
Страница 6: ...iv Verint Video Intelligence Solutions...
Страница 62: ...50 Verint Video Intelligence Solutions...
Страница 63: ...Verint Video Intelligence Solutions 51 Factory Default Configuration...
Страница 72: ...60 Verint Video Intelligence Solutions...
Страница 78: ...66 Verint Video Intelligence Solutions...
Страница 86: ...74 Verint Video Intelligence Solutions...
Страница 89: ...Verint Video Intelligence Solutions 77 S1100 Technical Specifications...
Страница 101: ...Verint Video Intelligence Solutions 89 Compliance...