![VERDER JEC JRZP Series Скачать руководство пользователя страница 24](http://html.mh-extra.com/html/verder/jec-jrzp-series/jec-jrzp-series_operating-and-maintenance-manual_1003761024.webp)
23
4.
Place the gear, lock washer (12) and lock nut (12-1) sequentially
onto the shafts and hand tighten.
In order to ensure proper rotor timing the gears must be installed
along with the rotors. Slide the gears on the shafts aligning the slot
on the gear with the gear key
5.
After the gears are installed, turn the shafts to make sure they turn
freely and that the rotors (38) are timed correctly. (Rotor
alignments are required)
See ‘Page 18 Rotor timing’ for reference.
6.
Use a spanner wrench to tighten the gear lock nut on the drive
shaft. You can install the rotors to hold the shafts in place while you
tighten the nut.
Tighten the locknut (12-1) on the idle shaft, following the previous
steps.
7.
Lubricate and install the rear oil seal cover (11) into gearbox (1).
Install the paper gasket (26) to the gasket face of the gearbox and
mount the rear cover assembly over the drive shaft extension onto
the gearbox.
8.
Set the cover bolts & oil window and fill the oil to the oil reservoir up
to the middle range of the oil window.
See the ‘LUBRICATION’ for further in APPENDIX.
9.
Set the pressure relief valve (13).
Fig. 48
Fig. 49
Fig. 50
Содержание JEC JRZP Series
Страница 1: ...Operating Maintenance Manual J JE EC C J JR RZ ZP P S Se er ri ie es s Circumferential Piston Pumps ...
Страница 29: ...28 PARTS LIST EXPLODED VIEW ZP015 ...
Страница 35: ...34 EXPLODED VIEW ZP030 ZP060 ZP130 ...
Страница 51: ...50 APPENDIX ...
Страница 53: ...52 ...
Страница 54: ...53 ...
Страница 55: ...54 ...
Страница 56: ...55 ...
Страница 57: ...56 ...
Страница 58: ...57 ...