ELGA
CENTRA – MDS/LDS/RDS US Operator Manual
CENTRA – MDS/LDS/RDS US Version 01 – 08/14
Page 19
Step 3 - Level control connection for external water
treatment equipment
The level control connection is required when the
CENTRA
is connected to the following supplies:
•
PURELAB Prima 20.
•
PURELAB Prima 30/60/90/120.
•
Other products from the PURELAB range meeting
specific system requirements.
If the water supply is direct and under pressure then level
connections are not required. Ref. Section 4.3, Step 1 -
Hydraulic connections.
1. GAIN access to the electrical area as described in
‘Electrical Supply Connection – Section 2a/2b'.
2. LOCATE the level control connection on the micro-
controller board.
•
PURELAB Prima 20 use 3.5mm jack socket (PCB
identifier J2)
•
PURELAB Prima 30/60/90/120 use 6 pin DIN socket
(PCB identifier JR1)
•
Refer to Technical Support for specific system
guidance.
Note: Only one level control socket must be used to
make a level control connection.
3. DIRECT the level control cable into the electrical
section via the cable tunnels.
4. PLUG the lead into the correct socket as described
in step 2.
5. ENSURE the lead is properly supported using the
local cable restraint.
6. CONNECT the other end of the LEVEL control cable
to the supply equipment.
CAUTION!
Failure to connect the CENTRA level control
may result in damage to the supply
equipment through over-pressurization.