background image

SUPERCEDES

TITLE

DATE

SECTION

CINCINNATI, OHIO

MFG., INC.

22174

C200

5-13-05

2-3-09A

INSTALLATION DWG

HT40KX, HT50KX, HT66KX

3.  Set the vehicle parking brake and put the vehicle transmission in "park" if it is an automatic.

4.  Deploy the outriggers to help stabilize the vehicle against rocking or overturning when lifting 

with

the crane.

PREPARATION FOR TRAVEL

1.  Return the outriggers to the stowed position.  Install and secure all pins.

2.  Stow the crane boom in the boom support.

3.  Hook the winch line to a tie down point on the body or pedestal and apply tension.

4.  Disengage the PTO pump and idle speed control.

5.  Unplug the control pendant and store in a body compartment or the cab.

MAINTENANCE

The crane requires only periodic lubrication.  As a standard procedure, this can be done at the
time the vehicle is serviced.

The winch planetary gearbox lube should be maintained at the level plug.

To ensure optimal winch performance, the following lube schedule and lube specifications
should be followed:

Initial Change - after 6 weeks or 10 hours of operation.
Periodic Change - on an annual basis or every 50 hours of operation.

Temp Range (°F)

Winch Hydraulic Oil

120 to10

SAE 50

40 to -25

75W90

30 to -50

Conoco DN600 or equivalent

Service grease fittings and rotation gear with molybdenum-disulfide graphite-filled lithium-
based extreme pressure grease.

Grease fitting locations:

Boom pivot at rear of boom
Speed reducer (2 fittings)
Elevation cylinder tail clevis
Bottom of Swing Bearing (2 fittings)

Remove rear cover and check all hydraulic tube and hose fittings for tightness.

Check electrical connections for looseness and corrosion.

Содержание HT50KX

Страница 1: ......

Страница 2: ......

Страница 3: ...5 HYDRAULIC TANK DIMENSIONS 22883 PTO INSTALLATION 22913 COMPARTMENT DRAWING 22245 WIRE ROPE INSTALLATION SECTION 400 REPLACEMENT PARTS 22987 HT40 50KX CRANE REPLACEMENT PARTS DRAWING 22988 HT40 50KX...

Страница 4: ......

Страница 5: ...SECTION 100 DESCRIPTION SPECIFICATIONS 7607100A...

Страница 6: ......

Страница 7: ......

Страница 8: ......

Страница 9: ...SECTION 150 SAFETY 8604150...

Страница 10: ...AL REQUIREMENTS WHEN OPERATING NEAR HIGH VOLTAGE LINES THIS SIGN IS PLACED ON THE CONTROL PENDANT SIDE OF BOOM REQUIRED MINIMUM CLEARANCES REFERRED TO ON SIGN NO 15401 REQUIRED CLEARANCES FROM OVERHEA...

Страница 11: ...YOU KNOW AND FOLLOW THE SAFETY AND OPERATING RECOMMENDATIONS CONTAINED IN THE MANUFACTURER S MANUALS YOUR EMPLOYER S WORK RULES AND APPLICABLE GOVERNMENT REGULATIONS AN UNTRAINED OPERATOR SUBJECTS HIM...

Страница 12: ...I19217 C150 10 17 97A 5 26 98B INSTALLATION DWG HT CRANES SUPERCEDES TITLE DATE SECTION WINCH SAFETY WARNINGS CINCINNATI OHIO MFG INC...

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ...SECTION 200 INSTALLATION 7607200A...

Страница 19: ...always reach the storage and travel position by rotating one way or the other HYDRAULIC CONNECTIONS The crane is furnished with a pressure return and a case drain hose that come down through the cente...

Страница 20: ...r lines and hoses are as follows RESERVOIR The PTO reservoir should have a capacity of 10 gallons non proportional or 25 gallons proportional fitted with 100 mesh suction screen 10 micron return line...

Страница 21: ...crane is operated by a remote control pendant The pendant should be unplugged and stored in a compartment when the crane is not in use Before plugging the pendant in inspect the plug socket cord pend...

Страница 22: ...rial numbers 80157 HT40 serial numbers 84092 and HT50 serial numbers 85086 and below the Overload system is inoperative if the boom elevation is at the bottom or top limit of travel To relieve this co...

Страница 23: ...es only periodic lubrication As a standard procedure this can be done at the time the vehicle is serviced The winch planetary gearbox lube should be maintained at the level plug To ensure optimal winc...

Страница 24: ...perate in manual override mode 1 Override the proportional valve by turning the red stem on the valve as stated below For override operation rotate stem clockwise the farther the stem is turned the fa...

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ......

Страница 29: ...TWO BLOCK WEIGHT STEP 3 INSERT WIRE ROPE END INTO POCKET OPENING ON WINCH AND THROUGH WEDGE POCKET AS SHOWN IN FIG 1 CAUTION IF THE WIRE ROPE IS NOT INSTALLED FOR THE CORRECT DRUM ROTATION THE WINCH...

Страница 30: ...SECTION 400 PARTS 7607400A...

Страница 31: ......

Страница 32: ...00 LB SINGLE LINE HT40KX NON PROP 11 22829 WINCH 3000 LB SINGLE LINE HT40KX PROP 12 22909 WINCH 4000 LB SINGLE LINE HT50KX NON PROP 13 22830 WINCH 4000 LB SINGLE LINE HT50KX PROP 14 15 19177 HYDRAULIC...

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ......

Страница 37: ......

Страница 38: ......

Страница 39: ...10MO VALVE BLOCK WU WD 19 H6801 1212 HYD ELBOW FITTING 12MO 12MJ 90 EXTRA LONG DROP VALVE RETURN OUT 20 FF6400 0610 REDUCER EXPANDER 6OFS 10MO ROTATION MOTOR 21 FF6801 0808 ELBOW 8OFS 8MO WINCH MOTOR...

Страница 40: ......

Страница 41: ......

Страница 42: ......

Страница 43: ......

Страница 44: ......

Страница 45: ......

Страница 46: ......

Страница 47: ......

Страница 48: ......

Страница 49: ...ARGE 8 15401 1 UNLAWFULTOOPERATEDECAL 9 22352 1 1 HT50KXBOOMCAPACITYDECAL RIGHT 10 22352 2 1 HT50KXBOOMCAPACITYDECAL LEFT 11 19747 2 HT50KXDECAL 12 15392 1 DANGERELECTROCUTIONHAZZARDDECAL 13 15391 1 C...

Страница 50: ......

Страница 51: ......

Страница 52: ...laim number Venturo requires the model and serial number Only authorized Venturo Dis tributors can perform warranty For the name and address of your local Venturo Distributor call the Warranty Claim D...

Отзывы: