Setup - 13
SPREADER SETUP & INSTALL KITS
SS575 Install 4100/4200 Kit
Document Number
Kit Number / Part Number
Model
Serial Number Range
09.700131
70.8113
SS575
All Units
Tools Required:
3/8” wrench
7/16” wrench*
1/2” wrench
9/16” socket*
3/4” socket
impact driver
7/32” drill bit*
drill* phillips screwdriver
side cut pliers
Before making repairs or adjustments set the parking
brake, turn off engine, and remove ignition key.
Always disconnect the negative battery cable from the
battery when working with electrical components. Always
work in a manner that does not put safety at risk!
Safety glasses must be worn during installation.
Ear (hearing) protection must be worn when
using air or power tools.
Installation Time (estimated)
1 hour
Installation Notes:
Right and left hand orienta
-
tion referred to in these instructions is determined
as if sitting on the tractor seat, facing forwards.
*Not necessary for all setup configurations.
1. Disconnect the negative battery cable from the
power unit’s battery.
2. Remove the nut and bolt from the positive and
negative battery cable clamps and replace them
with 5/16” x 1-1/2” bolts and nuts. Tighten the
positive clamp onto the positive battery terminal.
3. Install the fused positive wire onto the positive
cable clamp bolt and fasten with a 5/16” nut.
4. Install the negative cable onto the negative terminal
and tighten. Install the negative wire onto the nega-
tive cable clamp bolt and fasten with a 5/16” nut.
5. Using a side cut pliers, cut both battery terminal
covers at the locations shown and install onto
the battery terminals.
Cut Here
6. Install the spreader hitch onto the spreader using
4) 1/2” x 1-1/4” bolts and 4) 1/2” flat washers. Use
Loctite 242 or equivalent thread locker on bolts.
Torque to 45 ft-lbs (61 Nm).
7. Fasten the spreader’s power cord to the hitch
frame at two places using zip ties.