23
INSTALLATION
MANUAL
INSTALLATION
5. Prepare the wiring between the three-phase energy meter and the smart gateway
(stripping 6 mm from the ends of the wires going into the latter), place the power
and neutral cable contacts in the smart gateway and tighten the screws.
Neutral
Phase 1
Phase 1
Phase 2
Phase 2
Phase 3
Phase 3