Velocity VDOT-H2 Скачать руководство пользователя страница 15

 

GLT-299-7-2(3) Rev.0 

Mar 23, 2018 

 

 

15 

 

 

 

 

8.4 

Tamper resistance feature 

The VDOT-UB series, VDOT-S6 Base, and VDOT-STB series of smoke/heat detector mounting bases have a 

tamper- resist feature that works in conjunction with the heat detectors. When this feature is enabled, the heat 

detectors cannot be removed from the base without the use of a small hexagonal wrench. To avoid unauthorized 

removal of the heat detector, turn the locking screw in the mounting base counterclockwise until the screw extends 

out about 4 mm (3/16 in.)  from the rim of the base, as shown in the Figure 15. 

 

 
 
 
 
 
 
 
 
 
 
 

Figure 15

Position of the locking screw to lock the detector

 

Note:

 If the detector is installed on a high ceiling where a tool (ladder, etc.) is needed, it is not recommended to 

use the locking screw.  

 

Section 9 

– TESTING 

Notes:

 

•  Before testing, notify the proper authorities that the system is undergoing maintenance, and will 

temporarily be out of service. 

• Disable the system to prevent unwanted alarms. 
• All sensors must be tested after installation and periodically thereafter. 
• Testing methods must satisfy the Authority Having Jurisdiction (AHJ). 
• When carrying out site testing of the detector, the control panel must be set to “One Man Walk Test” 

mode prior to the test. 

Sensors offer maximum performance when tested and maintained in compliance with NFPA 72. The sensor may 

be tested in the following ways: 

A.  Direct Heat Method (Hair dryer of 1000 

– 1500 watts ) 

1.  From the side of the detector, direct the heat toward the sensor. Hold the heat source about 15 cm (6 in.) 

away to prevent damage to the cover during testing. 

2.  The red LEDs on the detector should light when the temperature at the heat detector reaches the alarm 

set point. If the red LED indicator fails to light, check the power to the detector and the wiring in the 

detector base. 

3.  After the detector has given the alarm condition, the detector automatically is reset by the control panel. 

The detector can also be reset at the control panel manually. Detectors that fail these tests should be 

cleaned as described under MAINTENANCE Section and retested. If the detectors still fail these tests 

they should be returned for repair. 

Содержание VDOT-H2

Страница 1: ...der chemicals or hydrogen sulphide may occur or affect the product It may cause damage to equipment Section 1 INTRODUCTION 1 1 General description The VDOT H2 and VDOT H2 H is an attractively styled l...

Страница 2: ...es an alarm in response to both 8 3 C 15 F rate of rise temperature or a 57 C 135 F fixed temperature alarm point The VDOT H2 H initiates an alarm in response to 83 C 181 F Heat detector incorporates...

Страница 3: ...RMINALS The VDOT H2 and VDOT H2 H heat detectors all have three terminal connections and the terminals are configured as follows Terminal Description 1 SLC Positive 6 SLC Negative 3 To activate VDOT S...

Страница 4: ...VDOT UB4 Standard mounting base GLT 299 7 6 4 inch 4 X X VDOT UB4 6 Larger mounting base GLT 299 7 7 6 inch 4 X X VDOT S6 Base Sounder mounting base GLT 299 7 10 6 inch 5 X VDOT STB RL Relay mounting...

Страница 5: ...the detector at least 10 cm 4 in from the wall The detector should not be installed in places such as Place with plenty of air flow close to a ventilation fan air conditioner or place with drafts Pla...

Страница 6: ...nted as a square Actual detector coverage covers a circle whose radius is 0 7 times the listed spacing Since all of the area within the detector s circle of coverage is suitable for detecting a fire t...

Страница 7: ...A A A B B B B C C C C D D D D Listed Spacing 9 1m x 9 1m 84m2 30ft x 30ft 900ft2 A 7 6m x 10 4m 79m2 25ft x 34ft 850ft2 B 6 1m x 11 3m 69m2 20ft x 37ft 740ft2 C 4 6m x 11 9m 54m2 15ft x 39ft 585ft2 D...

Страница 8: ...table here Ceiling Sidewall Note Measurements shown are to the closest edge of the detector Figure 5 Detector placement near ceiling or wall joints The following figure shows the required heat detecto...

Страница 9: ...84 4 3 to 4 9 m 14 to 16 ft 77 4 9 to 5 5 m 16 to 18 ft 71 5 5 to 6 0 m 18 to 20 ft 64 6 0 to 6 7 m 20 to 22 ft 58 6 7 to 7 3 m 22 to 24 ft 52 7 3 to 7 9 m 24 to 26 ft 46 7 9 to 8 5 m 26 to 28 ft 40 8...

Страница 10: ...4 m 8 ft on center If beams are greater than 46 cm 18 in in depth and are spaced more than 2 4m 8 ft on center then each bay formed by the beams must have at least one detector mounted on the ceiling...

Страница 11: ...iew Notes Detectors can be installed on the bottom of beams when the beams are less than 30 cm 12 in deep and beam spacing is less than 2 4 m 8 ft Beams less than 20 cm 8 in deep are considered flat c...

Страница 12: ...end of the ceiling Additional detectors if required must be located based on the horizontal projection of the ceiling and the type of ceiling construction For a ceiling slope of less than 30 degrees...

Страница 13: ...re 14 2 Using the VDOT AD2 Address Programmer set the desired address for each heat detector See Annex A for the handling 3 Install the heat detector into the mounting base making sure the wiring does...

Страница 14: ...o each loop Use cable AWG12 20 for wiring Do not connect different gauge cables at one terminal in order to prevent loosening CAUTION Do not connect cables in reverse polarity Failure to connect the p...

Страница 15: ...nsors must be tested after installation and periodically thereafter Testing methods must satisfy the Authority Having Jurisdiction AHJ When carrying out site testing of the detector the control panel...

Страница 16: ...nue as long as the outer ring makes contact with the ceiling b Hold the Heat Detector Tester over the detector until the detector alarms 7 Remove the Heat Detector Tester from the detector to stop tes...

Страница 17: ...tric shock CAUTION 1 Carefully remove the detector head from its base 2 Use a soft lint free cloth moistened with alcohol for sticky deposits to clean the plastic enclosure 3 Using a soft bristle brus...

Страница 18: ...del VDOT H2 0 C to 65 6 C 32 F to 150 F Model VDOT H2 H Operating Temperature 10 C to 55 C 14 F to 131 F Model VDOT H2 10 C to 65 6 C 14 F to 150 F Model VDOT H2 H Storage Temperature 20 C to 60 C 4 F...

Страница 19: ...stion or b at the Zeta s option repayment of the price where this had been paid And the warranty period is three 3 years from the shipment from Zeta s factory 12 3 Notwithstanding anything to the cont...

Страница 20: ...place Figure A 1 Mounting a detector on VDOT AD2 3 Press the Search Key a Buzzer sounds then the VDOT AD2 starts transmitting to the detector b Do not remove the detector when transmitting or damage c...

Страница 21: ...new address 2 Press the Set key a The buzzer sounds and all LED s are turned off The VDOT AD2 then starts transmitting to the detector b Do not remove the detector 3 The 7 segment LED shows the new ad...

Отзывы: