OPERATION
4.1
PRE
‐
OPERATION
Please
make
sure
of
power
voltage
before
power
on.
4.2
POWER
CONNECTION
▮
POWER
ON
Please
make
sure
of
power
voltage
before
power
on.
1.
Connect
DVR
to
D/C
power
Jack
by
using
adaptor
in
the
package.
2.
Having
finished
the
connection
between
power
cable
and
external
device,
power
is
on
by
pressing
button
on
the
rear
panel.
The
following
display
appears.
3.
Booting
time
takes
about
30
seconds
after
power
is
on.
4.
Video
signal
is
automatically
detected
when
power
is
on.
5.
The
menu
values
set
by
user
is
not
changed
in
sudden
power
failure.
37
Содержание Premium?series
Страница 17: ...PREMIUM STANDARD DVR 8CH 4CH 16...
Страница 27: ...INSTALLATION 3 1 TOTAL CONNECTION DIAGRAM 26...
Страница 72: ...5 3 CAMERA 5 3 1 CHANNEL 1 16 Select camera No to set up 71...
Страница 75: ...5 3 6 PTZ SPEED 0 1 2 3 4 To control the speed of PTZ camera 5 3 7 PTZ ID 0 255 To set up PTZ camera ID 73 74...
Страница 102: ...5 8 SYSTEM 5 8 1 LANGUAGE Select language to use and convert to the selected one when pressing ENTER button 101...
Страница 103: ...5 8 2 DATE TIME On the receipt of this DVR set the current time correctly and start recording 99 102...
Страница 109: ...To exit from this menu press INFO button again USB Model No DVD RW Model No 105 108...
Страница 116: ...Press Next button Press Next button 115...
Страница 119: ...Click Finish button and Net viewer is uninstalled 2 Program removal by Window s Program additional and removal 115 118...
Страница 120: ...6 2 3 NETVIEWER FUNCTION Double click the icon and the program is displayed on screen as follows 119...
Страница 123: ...2 Login Make sure of setup values saved in setup menu and press OK button CONNECT DISCONNECT Click 119 122...