34
5 Connecting to power supply and bus system
VEGAPULS 69 • Modbus and Levelmaster protocol
47252-EN-210205
Fig. 30: Connection steps 5 and 6
5. Insert the wire ends into the terminals according to the wiring plan
Information:
Solid cores as well as flexible cores with wire end sleeves are insert
-
ed directly into the terminal openings. In case of flexible cores without
end sleeves, press the terminal from above with a small screwdriver,
the terminal opening is then free. When the screwdriver is released,
the terminal closes again.
6. Check the hold of the wires in the terminals by lightly pulling on
them
7. Connect the cable screening to the internal ground terminal, con-
nect the outer ground terminal to potential equalisation in case of
power supply via low voltage
8. Connect the lead cable for voltage supply in the same way ac-
cording to the wiring plan, in addition connect the ground conduc-
tor to the inner ground terminal when powered with mains voltage.
9. Tighten the compression nut of the cable entry gland. The seal
ring must completely encircle the cable
10. Screw the housing lid back on
The electrical connection is finished.
Information:
The terminal blocks are pluggable and can be removed from the
housing insert. To do this, lift the terminal block with a small screwdriv-
er and pull it out. When inserting the terminal block again, you should
hear it snap in.