WPLLD Site Prep and Installation Guide
FE Petro Pumps
4-10
wires (one from the compression bushing [240 Vac power source] and one from the ump) in the capacitor housing.
Using the electrical connector provided, connect the two orange leads to the other wire from the WPLLD transducer.
6. Twist the WPLLD/Adaptor assembly a couple of turns counterclockwise and then screw it into the capacitor housing
port.
7. Remove the plug from the Line Test port and install the port fitting in its place (see Figure 4-11).
8. Connect one end of the Sensing Line to the Line Test port fitting and the other end to the WPLLD transducer
(Figure 4-11). Tighten connections and attach one of the “WARNING” tags to the Sensing Line. With the two 6-32 x
0.375” screws provided, attach the conduit box cover bracket to the top of the transducer. Snap the removed capacitor
housing cover into the storage bracket.
FE Petro Pumps
TRANSDUCER INSTALLATION
1. Turn Off, tag, and lockout power to pump.
2. Remove the plug from the top of the Pressure Test Port and adjust Valve Clamp if necessary (Figure 4-14).
3. For precision testing, install the FE Petro Model “R” precision check valve as shown in Figure 4-12.
Figure 4-12. Location of Precision Check Valve in FE Petro Pump
4. Install the pump fitting from the kit in the Pressure Test Port. IMPORTANT! Seal the NPT pipe threads on the fitting
with a UL-classified nontoxic thread sealant suitable for the fuel involved. Do not apply sealant to the threads
adjacent to the flare fitting.
OFF
pumps\feptor1.eps
Manifold
cover
Check valve
spring
FE Petro O-ring
Part No. 400211238 or 400333238
Model "R" Precision
check valve
Model "R" Precision
Check Valve Verification
Valve clamp (should be
snug up against cover)
Pressure Test Port - remove plug to access valve
clamp adjustment screw. Turn screw CCW until
valve clamp is all the way up and snug against
manifold cover. Do not replace plug in the Pressure
Test Port as the Sensing Line fitting will be installed
in this port.
"R" stamp
R
R
Bottom
View
Black ID nut
Top View