Table of Contents
iv
....................................................................................................32
Cold Boot ........................................................................................................................33
Warm Boot ......................................................................................................................34
Surge Protection for Communication Devices ................................................................35
DB-9 Connector Pin-Outs ...............................................................................................37
Comm Port 2 Pin-Outs ....................................................................................................37
Figures
Figure 1.
Control Drawing - Example TLS2/EMC2 System Site Layout ...................3
Console Dimensions and Designated Wiring Entry Knockouts .................7
Recommended Mounting of Console - International Installations .............8
Recommended Mounting of Console - Alternate Installations ..................9
Wiring AC Power to the Console .............................................................11
CPU Board Components .........................................................................12
Calculating the Correct Mag Probe Length for dedicated
riser installation .......................................................................................13
Mag Probe AST Installation Kit ...............................................................14
Metal Cap and Ring Kit ...........................................................................16
Modifying an Existing Metal Riser Cap ....................................................17
Installing Probe Canister Spacer Rings for 3- & 4-inch Risers ................19
Installing Insulating Sleeves for 2-inch Risers .........................................20
Probe Float/Boot Installation ...................................................................21
Probe Installation Example - Underground Storage Tank .......................23
U.S. Probe Installation Example - Above Ground Storage Tank .............24
Installing the Riser Adaptor .....................................................................25
Example Probe Wiring Run in Buried Rigid Conduit ...............................26
Example Probe Wiring Run Using the Direct Burial Method ...................27
Probe Field Wiring Connection ................................................................28
Epoxy Sealing Connections ....................................................................29
Connecting Probe Wiring to Console ......................................................31
Connecting Output Relay to Console ......................................................32
RAM Clear Jumper Positions ..................................................................33
Cold boot ‘No Tanks Configured’ message .............................................34
Example of Console Connected to a Remote Device Via
MDE800A Short-Haul Modems ...............................................................36
Tables
Table 1.
Mag Probe AST installation kit - Part No. 312020-984 ............................14
Cap and cord grip kit - Part No. 330020-282 ...........................................15
Metal Cap and Ring Kit - Part No. 312020-952 .......................................16
TLS2/EMC2 DB-9 Pin-Outs .....................................................................37
Comm Port 2 Configuration .....................................................................37