This manual describes the site preparation and installation procedures for the following Touch-Screen consoles:
• Veeder-Root TLS2 Console
• Gilbarco EMC2 Console
This manual assumes that you installing the console in a new site (before pavement is put down and with no wiring
runs in place). Among the topics covered are:
• Site layout considerations.
• Installing the console and connecting wiring from the 120 or 240 Vac power panel.
• Probe assembly and installation procedures.
• Installing wiring conduit between the console and its probes.
• Probe-to-console field junction box wiring diagram.
• Attaching probe wiring to the console.
• RS-232 serial communication connection requirements and serial commands.
After the console is wired to its power source and probes, you should program the console following the setup
instructions contained in the Setup and Operation manual.
Contractor Certification Requirements
Veeder-Root requires the following minimum training certifications for contractors who will install and setup the
equipment discussed in this manual:
Installer (Level 1) Certification:
Contractors holding valid Installer Certification are approved to perform wiring
and conduit routing; equipment mounting; probe, sensor and carbon canister vapor polisher installation; tank and
line preparation; and line leak detector installation.
TLS-350 Technician (Level 2/3 or 4) Certification:
Contractors holding valid TLS-350 Technician
Certifications are approved to perform installation checkout, startup, programming and operations training,
troubleshooting and servicing for all Veeder-Root TLS-300 or TLS-350 Series Tank Monitoring Systems, including
Line Leak Detection and associated accessories.
Warranty Registrations
may only be submitted by selected Distributors.
Related Manuals
577013-757
TLS2/EMC2 Setup & Operation Manual
577013-767
TLS2 RS-232 Serial Interface Manual
576013-859
Direct Burial Cable Installation Manual