  Installation

This section discusses the installation and wiring of the hardware required to enable the TLS console to perform 
pressure management of the site’s gasoline vapor processor equipment:

• Vapor Pressure Sensor

• Smart Sensor Interface Module

• NVMEM203 board

• Mod  Bus  Module

All field wiring, its type, its length, etc., used for TLS console sensors must conform to the requirements outlined in 
the Veeder-Root TLS-3XX Site Prep manual (P/N 576013-879). 

Vapor Pressure Sensor

Install one Vapor Pressure Sensor in the vapor return piping of the gasoline dispenser closest to the tanks 
following the instructions in the Vapor Pressure Sensor Installation guide (P/N 577013-797). 

Installing TLS Console Modules - General Notes 

TLS consoles have three bays in which interface modules can be installed; Comm bay, Power bay and Intrinsically-
Safe bay (ref. Figure 1). Probe Interface modules and Smart Sensor modules are installed in the Intrinsically-Safe 
bay and the Mod Bus module is installed in the Comm bay. 

In all cases, the position of the modules, their respective connectors and the devices wired to the 
connectors must be recorded to prevent improper replacement during installation or service. A circuit 
directory for Power and I.S. bay Interface Modules is adhered to the back of the right-hand door for 
this purpose.

Switch off power to the TLS console before you install modules and connect sensor wiring. 

Figure 1.  TLS console Interface Module Bays

OFF

console\350rjmods.eps

Intrinsically 

Safe Bay

Permissible 

Modules

(Limit 8 

per console)

1

2

3

4

5

6

7

8

16
15
14
13
12
11
10

9

1 2 3 4 

I.S. Bay
Slot Numbers

Power Bay
Slot Numbers

Comm Bay
Slot Numbers

Comm Cage*

Section 16

Pressure Management Control

16-3

Содержание TLS-350R

Страница 1: ...Manual No 577013 801 Revision A Install Setup Operation Manual Pressure Management Control Section 16 Pressure Management Control 16 i...

Страница 2: ...tailed description of the damage on the face of the freight bill The carrier s agent must verify the inspection and sign the description 2 Immediately notify the delivering carrier of damage or loss T...

Страница 3: ...a period of one 1 year from the date of installation or twenty four 24 months from the date of invoice whichever occurs first During the first ninety 90 days we or our representative will repair or re...

Страница 4: ...and Runtime Fault Alarm 19 Manual control 19 PMC Diagnostic Menu 19 Figures Figure 1 TLS console Interface Module Bays 3 Figure 2 Smart Sensor Setup 5 Figure 3 PMC Setup 6 Figure 4 TLS console alarm...

Страница 5: ...Port will be available for use by contractor or government inspectors Contractor Certification Requirements Veeder Root requires the following minimum training certifications for contractors who will...

Страница 6: ...is sup plied to the device A potential shock hazard exists TURN POWER OFF Live power to a device creates a potential shock hazard Turn Off power to the device and associ ated accessories when servicin...

Страница 7: ...which interface modules can be installed Comm bay Power bay and Intrinsically Safe bay ref Figure 1 Probe Interface modules and Smart Sensor modules are installed in the Intrinsically Safe bay and the...

Страница 8: ...em Grounding Probe and Sensor Shields Connect probe and sensor cable shields to ground at the console only Do not ground both ends of the shield CIRCUIT DIRECTORY A circuit directory is adhered to the...

Страница 9: ...ECT SS CATEGORY UNKNOWN C C E S E S E S P F SMARTSENSOR SETUP PRESS STEP TO CONTINUE SETUP MODE PRESS FUNCTION TO CONT M P C C C F P S T Change E Enter Function Print M Mode Step Tank Sensor Key press...

Страница 10: ...tes after start time Data collected 5 minutes before the Start of Test time is omitted from test S SET ANALYSIS TIME PRESS ENTER E S SET TEST START TIME TIME hh mm SET POST DELAY DURATION DELAY MINUTE...

Страница 11: ...rm messages The system automatically prints an alarm report showing the alarm type its location and the date and time the alarm condition occurred Warning and alarm posting causes the TLS console base...

Страница 12: ...ime the alarm was posted Alarm example in Figure 6 PMC Alarms are logged into the Priority Alarm History in the TLS Figure 6 TLS console alarm example MMM DD YYYY HH MM XM VP EMISSIONS WARN PMC ALARM...

Страница 13: ...VST ASC Level C Warnonthefirst day Yellow VP EMISSIONS To notify when the mass emissions exceeds the defined threshold for the system Failonconsecutive days Red TLS 350PMCVariablesetup ConfirmationPr...

Страница 14: ...YY HH MM SS XM ALL FUNCTIONS NORMAL S S S S EFFLUENT EMISSIONS TEST STATUS PASS S VP DUTY CYCLE TEST STATUS PASS pmc fig7 eps Prints out a copy of the PMC Status report See example at right C F P S T...

Страница 15: ...S 232 board DB25 female Slots 1 2 or 3 ATEN USB to DB9 serial adapter P N 576040 170 Serial I O PC Card Plugs into PCMCIA port Multiport board DB9 female Slot 4 Laptop TLS 350R TLS 350R USB male lapto...

Страница 16: ...tton you may see a repeat of the modem dialing windows in which case ignore cancel them all 4 When the Connect To window appears Figure 10 depending on your connection method select either COM1 If RS...

Страница 17: ...disabled If the code was enabled you would see a 6 digit number which you will need to enter to access the console refer to the Sending Console Commands paragraph below for more information SETUP MOD...

Страница 18: ...o the main screen If the RS 232 Security Code is disabled press and hold the Ctrl key while you press the A key then type in IV8200 If the RS 232 Security Code is enabled e g 000016 you must enter the...

Страница 19: ...ocessor Status Report See example Figure 13 SOH IV8200 Vapor Processor Runtime Diagnostic Report See example Figure 14 SOH IV8000 Percent Hydrocarbon Diagnostic Report See example Figure 15 SOH IV8100...

Страница 20: ...SSOR PMC MONITORING TEST PASS FAIL THRESHOLDS PERIOD BELOW ABOVE VAPOR PROCESSOR PRESSURE FAIL 90th PERCENTILE 1DAYS 1 00 INCHES H2O VAPOR PROCESSOR MASS EMISSION FAIL 1DAYS 0 64 LBS 1KG VAPOR PROCESS...

Страница 21: ...5 NO 3 09 07 1 15PM 17 92 0 278 0 268 NO 3 10 07 3 01AM 7 70 0 200 0 223 NO 3 10 07 4 30AM 4 02 0 202 0 224 NO 3 10 07 7 54PM 23 62 0 306 0 245 NO 3 11 07 11 24PM 6 55 0 256 0 213 NO 3 12 07 11 31PM 2...

Страница 22: ...M 1 042 8 25 07 7 57AM 1 040 8 25 07 7 57AM 1 040 8 25 07 7 57AM 1 032 8 25 07 7 57AM 1 030 8 25 07 7 56AM 1 050 8 25 07 7 56AM 1 040 8 25 07 7 56AM 1 040 8 25 07 7 56AM 1 032 8 25 07 7 55AM 1 050 8 2...

Страница 23: ...anual Note If the PMD is on and the PMC mode is Automatic changing the control mode to Manual mode will turn the PMD off PMC Diagnostic Menu Figure 16 PMC Diagnostic Menus PMC VERSION 01 00 PRESS STEP...

Страница 24: ...For technical support sales or other assistance please visit www veeder com Section 16 Pressure Management Control 16 20...

Отзывы: