background image

Notice

Veeder-Root makes no warranty of any kind with regard to this publication, including, but not limited to, the implied warranties of
merchantability and fitness for a particular purpose.

Veeder-Root shall not be liable for errors contained herein or for incidental or consequential damages in connection with the
furnishing, performance, or use of this publication.

Veeder-Root reserves the right to change system options or features, or the information contained in this publication.

This publication contains proprietary information which is protected by copyright. All rights reserved. No part of this publication
may be photocopied, reproduced, or translated to another language without the prior written consent of Veeder-Root.

Contact Red Jacket Technical Support for additional troubleshooting information at 800-323-1799.

DAMAGE GOODS/LOST EQUIPMENT

Thoroughly examine all components and units as soon as they are received. If any cartons are damaged or missing, write a
complete and detailed description of the damage or shortage on the face of the freight bill. The carrier's agent must verify the
inspection and sign the description. Refuse only the damaged product, not the entire shipment.

VR must be notified of any damages and/or shortages within 30 days of receipt of the shipment, as stated in our Terms and
Conditions.

VEEDER-ROOT’S PREFERRED CARRIER

1.

Fax Bill of Lading to V/R Customer Service at 800-234-5350.

2.

Call V/R Customer Service at 800-873-3313 with the specific part numbers and quantities that were received damaged or
lost.

3.

VR will file the claim with the carrier and replace the damaged/missing product at no charge to the customer. Customer
Service will work with production facility to have the replacement product shipped as soon as possible.

CUSTOMER’S PREFERRED CARRIER

1.

Customer files claim with carrier.

2.

Customer may submit a replacement purchase order. Customer Service will work with production facility to have the
replacement product shipped as soon as possible.

3.

If “lost” equipment is delivered at a later date and is not needed, VR will allow a Return to Stock without a restocking fee.

4.

VR will NOT be responsible for any compensation when a customer chooses their own carrier.

RETURN SHIPPING

For the parts return procedure, please follow the instructions in the “General Returned Goods Policy” pages of the “Policies and
Literature” section of the Veeder-Root North American Red Jacket Mechanical Products Price Book.   Veeder-Root will not accept
any return product without a Return Goods Authorization (RGA) number clearly printed on the outside of the package.

 ©Veeder-Root 2017. All rights reserved

.

Содержание DEF

Страница 1: ...Manual No 577014 344 Revision C Installation Manual DEF Recirculation Control...

Страница 2: ...f any damages and or shortages within 30 days of receipt of the shipment as stated in our Terms and Conditions VEEDER ROOT S PREFERRED CARRIER 1 Fax Bill of Lading to V R Customer Service at 800 234 5...

Страница 3: ...ensor Field Wiring 9 Sealing Field Connections 9 Wiring Run Through Rigid Conduit 9 Direct Burial Cable 10 Console Wiring Precautions 10 Connecting Sensor Wiring To The Console 11 Figures Figure 1 DEF...

Страница 4: ...dependently or concurrently with the DEF pump Figure 1 DEF Fluid Temperature Monitoring Components DEF Dispenser DEF Dispenser Heat Trace manufacturer required GFI EPD circuit breaker per NEC Article...

Страница 5: ...install intrinsically safe apparatus use the specific control drawing that appears on the nameplate of the applicable associated apparatus ATG Console The control drawings contain information related...

Страница 6: ...Operator s Manual CLASS I Division 1 Group D CLASS 1 Zone 0 Hazardous Location Intrinsically Safe Apparatus DEF Temperature Sensor Intrinsically Safe Wiring White Brown Black Black I S Rigid Conduit...

Страница 7: ...o alert you to important safety hazards and precautions GENERAL Ensure that all local council and regulations are complied with Also ensure that all recognized safety codes are followed EXPLOSIVE Fuel...

Страница 8: ...energy limited system This system makes the sensors suitable for use in hazardous locations Sensor wiring is intrinsically safe only when connected to the TLS console All sensor wiring must be contai...

Страница 9: ...service this equipment in accordance with these codes regulations and standards may lead to legal citations with penalties or affect the safe use and operation of the equipment ISO STANDARD FOR DEF Th...

Страница 10: ...must be observed Keep fluid away from the motor cable Follow internal instructions Wear protective clothing face and breathing protection protective gloves etc De ploy safety barricades around work a...

Страница 11: ...d install it into the bushing 4 Loosen the nut on the tube fitting and insert the temperature sensor into the tube fitting enough but not more than 6 to ensure the 1 4 diameter section of the sensor i...

Страница 12: ...ugh the seal off box the conduit attaching the junction box to the seal off box and into the junction box 2 Using wire nuts connect the two wires from the sensor to the two wires coming from the conso...

Страница 13: ...nec tors without reprogramming that device 879 38 eps To console Tie wrap Wire nuts From probe sensor or transducer A C B Make sure that the ends of cable sheathing are sub merged in sealant nt t t nt...

Страница 14: ...sensor is NOT grounded 3 Write in the device name for each wire connection on the connector block in the module s wiring label attached to the inside of the door 4 Make sure that you loop the wire nea...

Страница 15: ...m Relay Contact Ratings 120 240 Vac 5A 30 Vdc 5A Fuse ratings 5A 250 Vac Type T Slo Blo TLS 450PLUS TLS XB TLS4 Control Of DEF Piping Heat Trace Circuitry If Required HV Relay Outputs Control Of DEF P...

Страница 16: ...For technical support sales or other assistance please visit www veeder com...

Отзывы: