VECTRIX VX-2 SERVICE MANUAL
Version 1.0/July 2011
VECTRIX, LLC
SECTION C-2: THROTTLE
Preparations:
Disassemble Front Vertical Panel-Lower
see Section B-4
Disassemble Front Vertical Panel-Upper
see Section B-5
Disassemble Front Console Cover
see Section B-2
Lower Regen Throttle Box Replacement
S-XC-S00077
Tools Required:
PH #2
8mm Turned Full-contact Hexagonal Socket (S02445)
Removal Procedure
1. Turn ignition key to the off position.
2. Remove three screws (#3, #3, #4) from the lower throttle box assembly.
3. Lift the kill switch housing (1) up and away from lower box.
4. Using 8mm Hexagonal Socket S02445 remove two lower box U-Bolt nuts (5).
Note the orientation of the throttle return spacers and spring for reassembly.
5. Remove the U-Bolt (6). Pull down on the lower box (2) and remove.
6. Slide the throttle assembly off of the handlebar.
https://www.motorcycle-manual.com/
Содержание VX-2
Страница 68: ...VECTRIX VX 2 SERVICE MANUAL Version 1 0 July 2011 VECTRIX LLC https www motorcycle manual com...
Страница 70: ...VECTRIX VX 2 SERVICE MANUAL Version 1 0 July 2011 VECTRIX LLC https www motorcycle manual com...
Страница 71: ...VECTRIX VX 2 SERVICE MANUAL Version 1 0 July 2011 VECTRIX LLC https www motorcycle manual com...
Страница 73: ...VECTRIX VX 2 SERVICE MANUAL Version 1 0 July 2011 VECTRIX LLC https www motorcycle manual com...
Страница 76: ...VECTRIX VX 2 SERVICE MANUAL Version 1 0 July 2011 VECTRIX LLC https www motorcycle manual com...
Страница 77: ...VECTRIX VX 2 SERVICE MANUAL Version 1 0 July 2011 VECTRIX LLC https www motorcycle manual com...
Страница 78: ...VECTRIX VX 2 SERVICE MANUAL Version 1 0 July 2011 VECTRIX LLC https www motorcycle manual com...