40
INSTALLATION
Connecting a secondary indicating instrument
Install the power supply to the second instrument in the same way as for
the first one (see page 37). The instrument for indicating wind speed is
set in the same way as the main indicating instrument (see page 16).
The power supply of both indicating
instruments must be switched on at
the same time.
The main and secondary indicating
instruments should be connected
as shown below.
Up to 3 subsidiary indicating instru-
ments can be connected to the main
indicating instrument as well as to
each of the secondary indicating
instruments.
Main indicating instrument
One or more secondary
indicating instruments
4
4
8
4
8
4
Primary speed indicating inst.
Secondary speed indicating inst.
Primary direction ind. inst.
Secondary direction ind. inst.
olwind_e.qxd 21.06.99 13:35 Seite 40
Содержание Ocean Line WIND
Страница 2: ...Installation and Operating Instructions Page 22 40 21 ...
Страница 3: ...22 ...