PaX-i3D Green (PHT-60CFO) User Manual
132
10 Cleaning and Maintenance
10.2.2
Maintenance Task Checklis
Maintenance Tasks
Maintenance
period
Before operation, ensure that the equipment is clean and
ready for use. Make sure that all parts which come into
contact with the patient have been disinfected and cleaned.
Daily
After using the equipment, make sure that the main power
switch has been turned off.
Daily
Ensure that the equipment is firmly plugged into a dedicated
power source.
Daily
Ensure that the plug and power cord are not hot..
Daily
Confirm that the orange (exposure) indicator lamp turns
on when the exposure switch is pressed. Ensure that the
orange (exposure) indicator light remains on for the entire
duration of the exposure.
Daily
Ensure that the power cable is not kinked, broken, exposed
and that it is free of all other defects.
Weekly
Confirm that activating the emergency stop switch ceases
the unit’s operation. Pressing the emergency stop switch
should stop all equipment movements and X-ray emission.
Weekly
Ensure that all visible labels are intact and legible.
Monthly
Check for possible wear or damage to the exposure switch
cable.
Monthly
Confirm that the audio message is audible throughout the
duration of the exposure.
Monthly
[PI3DG_130U_44A_en]User Guide.indd 132
2016-05-24 오후 4:19:14
Содержание PaX-i3D Smart
Страница 1: ...Version 1 5 0 PHT 60CFO User Manual E n g l i s h...
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 10: ......
Страница 14: ......
Страница 42: ...This page is left intentionally blank...
Страница 110: ......
Страница 126: ......
Страница 127: ...Troubleshooting 9...
Страница 133: ...Disposing of the Unit 11...
Страница 146: ......
Страница 167: ...13 Samsung 1 ro 2 gil Hwaseong si Gyeonggi do Korea Postal Code 18449...