![Vatech Green X Скачать руководство пользователя страница 55](http://html1.mh-extra.com/html/vatech/green-x/green-x_installation-manual_3611326055.webp)
4. Installing the X-ray Unit: Base Stand Type
Green X / X18
(Model: PHT-75CHS) Installation Manual 47
En
glis
h
4. Fix the CEPH unit to the main unit with M8X20 wrench bolts and washers.
When tightening the bolt, place a spirit level on the CEPH unit.
Required
Tool
Allen Wrench
6 mm / 0.24”
Allen Wrench
8 mm / 0.31”
Parts and
Accessory
Wrench Bolt
M8 x 20 - 4 pcs
(Part No. 25)
C E Washer
4 pcs
(Part No. 25)
Содержание Green X
Страница 1: ...Installation manual Model PHT 75CHS Version 1 10 English...
Страница 2: ......
Страница 8: ......
Страница 40: ...3 Before the Installation 32 Green X X18 Model PHT 75CHS Installation Manual Transportation Example...
Страница 116: ...9 Installing Software 108 Green X X18 Model PHT 75CHS Installation Manual 3 Click Finish to complete the installation...
Страница 144: ......
Страница 146: ...Appendix A 2 Green X X18 Model PHT 75CHS Installation Manual Schematic Diagram Components Supplied...
Страница 162: ...Appendix A 18 Green X X18 Model PHT 75CHS Installation Manual This Page Left Blank Intentionally...
Страница 164: ...com...