![Vatech Green X Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/vatech/green-x/green-x_installation-manual_3611326035.webp)
3. Before the Installation
Green X / X18
(Model: PHT-75CHS) Installation Manual 27
En
glis
h
3.3
Unpacking the X-ray Unit
The X-ray unit, PC, and accessories are delivered in the main box. The main box and
foams from the inside of the box can be recycled. Unpack the main box following the
instructions in
3.3.1 Main Box
.
3.3.1 Main Box (Box no.1)
Component
Size (mm / inch)
Weight (kg/lbs.)
Column and Rotating
unit Assembly
Accessories and Parts
PC System (Optional)
Monitor (Optional)
1780 (L) x 780 (W) x 1000 (H)
/ 70.1" (L) x 30.7" (W) x 39.4" (H)
221 / 487
After unpacking the X-ray unit, return the main box to your
VATECH service representative or dispose of the box
following the recycling guide in your country.
The edges of the main box may be sharp. Wear gloves
when opening the box
.
Two persons are recommended when handling the main
box.
1000
780
Содержание Green X
Страница 1: ...Installation manual Model PHT 75CHS Version 1 10 English...
Страница 2: ......
Страница 8: ......
Страница 40: ...3 Before the Installation 32 Green X X18 Model PHT 75CHS Installation Manual Transportation Example...
Страница 116: ...9 Installing Software 108 Green X X18 Model PHT 75CHS Installation Manual 3 Click Finish to complete the installation...
Страница 144: ......
Страница 146: ...Appendix A 2 Green X X18 Model PHT 75CHS Installation Manual Schematic Diagram Components Supplied...
Страница 162: ...Appendix A 18 Green X X18 Model PHT 75CHS Installation Manual This Page Left Blank Intentionally...
Страница 164: ...com...