background image

Conveyor Components

 

IR Heater

 

 

-

 w/ J Sensor

 

Gear Motor

 

Belt

 

Aligner

 

Front Pulley

 

Chamber Components

 

Component Identification

 

Control Box

 

Exhaust Stack

 

Rear Pulley

 

Crank Handle

 

Filtered Intake

 

(EC

-

II

-

30 Shown)

 

Belt

 

The conveyor belt is made of Teflon coated fiberglass. It is joined together with an alligator lace using a steel pin to connect each side. 

The belt will not burn under normal conditions, but the dryer should always have the belt moving while the heaters are above 300 de-

grees. The belt should remain tracked in the center of each pulley. (See 

Belt Installation and Tracking

” 

for adjustment instructions.)

 

 

Aligner

 

The aligner is a device for tracking the belt and keeping it on the pulley. As the belt moves from side to side the aligner is used for ad-
justments to keep it centered. The belt does not have to be perfectly centered on the pulley but should not be hanging over either edge. 

 

 

Pulley

 

The pulleys at either end of the conveyor are made by VASTEX of 4 ½  inch steel tubing with ¾  inch center shaft. They are mounted on 
self aligning flange bearing blocks for precision rolling. 

 

 

Gear Motor

 

A 130 Volt DC gear motor is located to the rear of the conveyor. It drives the rear pulley and belt with a roller and a #35chain.

 

 

Replacement part numbers can be found on your dryer

s wiring diagram.

 

IR Heater

 

The infrared heaters in VASTEX dryers emit medium wave infrared heat, perfect for curing plastisol inks. The heater connections are 

located in the trough on the right side of the heater, connected with high temperature terminals and stainless steel socket head cap 

screws. 

 

 

J Sensor

 

Vastex uses a mineral insulated 

Type J

” 

Thermocouple mounted under the first heating element on the right side. It is shielded to pro-

vide a near 

closed loop

” 

control system.  The sensor reacts very quickly to heater changes and is designed to be aware of changes in 

the chamber

s environment.  The sensor is wired to the Digital Temperature Controller found on the control panel.

 

 

Refer to wiring diagram when replacing 

J

” 

Sensor.

 

(if SBER is displayed on controller, 

J

” 

Sensor is malfunctioning)

 

 

Control Box

 

The Control Box contains most electrical components and is designed for easy maintenance.  Connections should be checked after the 

first (3) months of use and every (6) months after. More information on the Control Box can be found in the 

Controls

 sections.

 

 

Crank Handle

 

Used to raise and lower IR Heater assembly.  Turning the handle clockwise raises the elements, counterclockwise lowers them. Vastex 
dryers use three variables to control the curing process, 1) Belt speed, 2) Temperature and 3) Heater height (Heater Focusing).

 

 

Exhaust Stack

 

4” 

exhaust stack. See Dryer & Exhaust Hood Ducting for proper venting.

  

 

(Note: Restricting the dryers exhaust can affect the operation of the dryer causing excessive heat buildup within the chamber 

and fumes to fill the chamber and work area. The excessive heat buildup in the chamber may damage the dryers exhaust blow-

er. Proper venting is important.)

 

 

 

Filters the incoming air.  Clean or replace this filter often and as needed, replacement filters p/n (06

-

22

-

040)

 

Filtered Intake

 

Pg. 8

Содержание EconoRed-II Series

Страница 1: ...r future reference Date ____ ____ ______ Electrical Drawing Rev ______ Pg VTX Vastex E mail assistance Purchasing Product Info sales vastex com Electrical Support stech vastex com Tech Support Mechani...

Страница 2: ...on the heat Allow dryer to cool to 300 F 149 C before switching off conveyor Always turn off power at the main disconnect at the end of production In case an abnormal symptom occurs for example exces...

Страница 3: ...conditions so long as the procedures and instructions given in this manual are followed Safe handling transport and storage Before storing the unit follow the shutdown procedure on Pg 11 or on the fro...

Страница 4: ...raise the other side and insert both up per and lower bolts and nuts Install remaining bolt on first side and tighten all bolts Use the same procedure for installing rear end section Be sure all end...

Страница 5: ...ave a licensed electrician complete the electrical hook up and fill out the warranty card Send it back to Vastex to validate your warranty A wiring diagram has been included with this manual One is al...

Страница 6: ...retighten all bolts Recheck belt tracking at front end Note Do not over tighten belt 1 to 2 belt sag is desirable Belt aligner pulley Aligner Bolt Conveyor Front End Drive roller adjustor Adjustor sc...

Страница 7: ...nsioner DRIVE ROLLER TENSIONER 4 Drive End RH Side Drive End LH Side CONVEYOR BELT PATH TOP OF BELT BELT RETURN Optional HD Drive After conveyor belt is installed adjust Drive Roller Tensioner to achi...

Страница 8: ...d in the trough on the right side of the heater connected with high temperature terminals and stainless steel socket head cap screws J Sensor Vastex uses a mineral insulated Type J Thermocouple mounte...

Страница 9: ...gital Volt Meter displays in volts the amount of power going to the belt motor This makes setting and adjusting belt speed much easier A table showing the time associated with voltage can be found in...

Страница 10: ...k top of cover and pull straight off Note Cover cannot be removed with the disconnect in the ON position The handle and shaft are keyed to prevent this Installation is the reverse of Removal Be sure t...

Страница 11: ...located directly under the heater so it will read a much higher temperature than seen at the garment Set the tem perature several hundred degrees higher to compensate for this difference A non contact...

Страница 12: ...h the dryer for more than 10 minutes it is recommended to lower the heat set point to 500 F 260 C It will take approximately 10 minutes to return to operating temperature Periodically check ink temper...

Страница 13: ...ator chain is located inside the chamber and can be accessed by removing the lid from the top of your dryer Connections Elevator Chain Caution Power must be turned off at the external disconnect befor...

Страница 14: ...ng power available Upon completion of auto tuning the new PID settings are automatically entered into the controller s non volatile memory Manual Mode In the event of a faulty J Sensor the display wil...

Страница 15: ...DC Check for obstruction in belt path Check belt tension Check brushes on motor Optional HD mo tor Troubleshooting Controller Error Codes Symptom Cause s Solution s 5 b E r Sensor break error Replace...

Страница 16: ...Pg 16...

Страница 17: ...licensed trucker shall constitute delivery to Buyer and be determinative of the date and time of shipment and all risk of loss or damage in transit shall be borne by Buyer If the Buyer fails to accept...

Страница 18: ...Pg 18...

Страница 19: ...Pg 19...

Страница 20: ...Pg 20...

Отзывы: