Vasco NIVA FC115 Скачать руководство пользователя страница 9

08    HYDRAULIC CONNECTIONS / CONDENSATION DISCHARGE    

HYDRAULIC 

CONNECTIONS

The choice and sizing of the hydraulic lines must be made by an expert who 
must operate according to the rules of good technique and the laws in force, 
taking into account that undersized pipes cause a malfunction.

To make the connections:
-  position the hydraulic lines
-  tighten the connections using the “spanner and counter spanner” method
-  check for any leaks of liquid
-  coat the connections with insulating material.

The hydraulic lines and joints must be thermally insulated.
Avoid partially insulating the pipes.
Do not over-tighten to avoid damaging the insulation.
Use hemp and green paste to seal the threaded connections; the use of Teflon 
is advised when there is anti-freeze in the hydraulic circuit.

The condensation discharge network must be suitably sized (minimum inside 
pipe diameter 16 mm) and the pipeline positioned so that it keeps a constant 
inclination, never less than 1%.The discharge pipe is connected directly to the 
discharge tray, positioned at the bottom of the side shoulder underneath the 
hydraulic fixtures. 
-  If possible, make the condensation liquid flow directly in a gutter or a   
 

“rainwater” discharge.

-  When discharging directly into the main drains, it is advisable to make a  
 

siphon to prevent bad smells returning up the pipe towards the room. 

 

The curve of the siphon must be lower than the condensation collection  

 bowl.
-  If the condensation needs to be discharged into a container, it must be  
 

open to the atmosphere and the tube must not be immerged in water to  

 

avoid problems of adhesiveness and counter-pressure that would interfere  

 

with the normal outflow.

-  If there is a height difference that could interfere with the outflow of the  
 

condensation, a pump must be mounted:

-  in a vertical installation mount the pump under the lateral drainage tray;
-  in a horizontal installation the pump position must be decided according to  
 

the specific requirements.

Such pumps are commonly found in commerce.

However, on completion of the installation it is advisable to check the correct 
outflow of the condensation liquid by slowly pouring about ½ l of water into the 
collection tray in about 5-10 minutes.

75

95

115

DIMENSIONS

Pipeline diameter mm

14

14

16

CONDENSATION 

DISCHARGE

Содержание NIVA FC115

Страница 1: ...R MANUEL D INSTALLATION NIVA CONVECTEUR VENTILO INSTALLATIONSANWEISUNG NIVA GEBL SE KONVEKTOR INSTALLATION MANUAL NIVA FAN COIL UNIT MANUALE DI INSTALLAZIONE NIVA VENTILO CONVECTOR INSTRUKCJA INSTALAC...

Страница 2: ...stallation distances 5 Installation 6 Vertical floor or wall installation 7 Hydraulic connections 7 Condensation discharge 7 Filling the system 8 Evacuating air while filling the system 8 Electrical c...

Страница 3: ...ger Signals to the personnel that the operation described could cause physical injury if not performed according to the safety rules Danger of high voltage Signals to the personnel that the operation...

Страница 4: ...tem to OFF Close the water taps If there is the risk of freezing make sure that anti freeze has been added to the system otherwise empty the system If the room temperature is too low ot too high it is...

Страница 5: ...indications of the manufacturer It is forbidden to pull cut or knot the electrical cables coming out of the appliance even if it is disconnected from the mains supply It is forbidden to poke objects...

Страница 6: ...FC95 FC115 DIMENSIONS A mm 735 935 1135 3 4 D E 5 6 7 B C A 8 E D 2 C B A 1 MACHINE NR PROJECT G3 4 EK G3 4 EK 1X230V PE NL FR DE EN IT PL TECHNICAL DATA 2 PIPES FC75 FC95 FC115 Water contents l 0 47...

Страница 7: ...r flow the installation wall is preferably an outside perimeter wall to allow the discharge of the condensation outside The following descriptions of the various mounting phase and the relative design...

Страница 8: ...brackets 13 12 11 10 9 14 8 7 6 16 15 14 13 12 11 10 9 4 G H J K 3 2 1 L M 5 4 3 2 1 A B C 5 6 7 8 F E D DATUM SCHAAL GET MACHINE NR TEKENING NR ISO B 3650 DILSEN Tel 32 089 79 04 11 Fax 32 089 79 05...

Страница 9: ...ed at the bottom of the side shoulder underneath the hydraulic fixtures If possible make the condensation liquid flow directly in a gutter or a rainwater discharge When discharging directly into the m...

Страница 10: ...ss the valve stopper to open Open all the system interception devices manual or automatic Start filling the device by slowly opening the system water filling tap Take a screwdriver and act on the brea...

Страница 11: ...nsable to keep the FCU in perfect working condition safe and reliable over the years This can be done every six months for some interventions and annually for others by the Technical Service Assistanc...

Страница 12: ...the system load losses To ensure a correct adjustment and balancing of the circuit follow the procedure indicated below With a screwdriver loosen and remove the slotted grub screw inside the hexagonal...

Страница 13: ...12 LOCKSHIELD ADJUSTMENT load losses based on the adjustment of the lockshield present in all kits...

Страница 14: ...3 WAY VALVE diagram of load losses of 3 way valve in completely open position 3 WAY VALVE 13 NL FR DE EN IT PL...

Страница 15: ...diagram of load losses of 3 way valve in completely closed position 14 LOCKSHIELD ADJUSTMENT...

Страница 16: ...do not intervene personally The ventilation does not activate even if there is hot or cold water in the hydraulic circuit The appliance leaks water during the heating function The appliance leaks wate...

Страница 17: ...fully tighten the connections The appliance leaks water during the heating function Leaks in the valve unit Check the state of the gaskets Check the correct positioning of the thermo acoustic insulati...

Страница 18: ...oid if the FCU is used under the aforementioned conditions The installer should contact Vasco for return shipment of defective components The installer will receive a warranty return number The defect...

Страница 19: ...Kruishoefstraat 50 B 3650 Dilsen T 32 0 89 79 04 11 F 32 0 89 79 05 00 info vasco eu www vasco eu 90 DR013038 D...

Отзывы: