background image

75

95

115

DIMENSIONS

Pipeline diameter mm

14

14

16

3

4

F

D

E

5

6

7

B

C

A

8

2

F

1

E

D

3

4

2

C

B

A

1

DATUM

SCHAAL

GET.

MACHINE NR.

TEKENING NR.

ISO

B 3650 DILSEN

Tel. +32 (089) 79.04.11

Fax. +32 (089) 79.05.00

PROJECT

BENAMING

A3

Ventilo Niva SL600

99 Ventilo

JD

25/08/2017

xxx

 

(1:2)

MOUNTING THE CONDENSATION DISCHARGE PIPE 

Connect a pipe adequately to the discharge fitting (A) of the condensation
collection tray. Check that the extension drip (B) is present and correctly
installed.
 

When starting up the system, make sure that the hydraulic unit lockshield is
open When electric power is still switched off, but the thermo-valve has already
been powered, use the special cap to press the valve stopper to open.

-   Open all the system interception devices (manual or automatic);
-   Start filling the device by slowly opening the system water filling tap;
-   Take a screwdriver and act on the breather of the battery;
-   When water starts coming out of the breather valves of the appliance, close
     them and continue filling until reaching the nominal value for the system.

Check the hydraulic seal of the gaskets.
It is advisable to repeat these operations after the appliance has been running
for a few hours and periodically check the pressure of the system.

    FILLING THE SYSTEM / EVACUATING AIR WHILE FILLING THE SYSTEM    09

ø14mm

A

B

A

  discharge fitting 

B

  tube for the outflow of the liquid 

FILLING 

THE SYSTEM

EVACUATING AIR 

WHILE FILLING 

THE SYSTEM

NL

FR

DE

EN

IT

PL

A

A

  Venting of the battery

Содержание NIVA FC115

Страница 1: ...R MANUEL D INSTALLATION NIVA CONVECTEUR VENTILO INSTALLATIONSANWEISUNG NIVA GEBL SE KONVEKTOR INSTALLATION MANUAL NIVA FAN COIL UNIT MANUALE DI INSTALLAZIONE NIVA VENTILO CONVECTOR INSTRUKCJA INSTALAC...

Страница 2: ...stallation distances 5 Installation 6 Vertical floor or wall installation 7 Hydraulic connections 7 Condensation discharge 7 Filling the system 8 Evacuating air while filling the system 8 Electrical c...

Страница 3: ...ger Signals to the personnel that the operation described could cause physical injury if not performed according to the safety rules Danger of high voltage Signals to the personnel that the operation...

Страница 4: ...tem to OFF Close the water taps If there is the risk of freezing make sure that anti freeze has been added to the system otherwise empty the system If the room temperature is too low ot too high it is...

Страница 5: ...indications of the manufacturer It is forbidden to pull cut or knot the electrical cables coming out of the appliance even if it is disconnected from the mains supply It is forbidden to poke objects...

Страница 6: ...FC95 FC115 DIMENSIONS A mm 735 935 1135 3 4 D E 5 6 7 B C A 8 E D 2 C B A 1 MACHINE NR PROJECT G3 4 EK G3 4 EK 1X230V PE NL FR DE EN IT PL TECHNICAL DATA 2 PIPES FC75 FC95 FC115 Water contents l 0 47...

Страница 7: ...r flow the installation wall is preferably an outside perimeter wall to allow the discharge of the condensation outside The following descriptions of the various mounting phase and the relative design...

Страница 8: ...brackets 13 12 11 10 9 14 8 7 6 16 15 14 13 12 11 10 9 4 G H J K 3 2 1 L M 5 4 3 2 1 A B C 5 6 7 8 F E D DATUM SCHAAL GET MACHINE NR TEKENING NR ISO B 3650 DILSEN Tel 32 089 79 04 11 Fax 32 089 79 05...

Страница 9: ...ed at the bottom of the side shoulder underneath the hydraulic fixtures If possible make the condensation liquid flow directly in a gutter or a rainwater discharge When discharging directly into the m...

Страница 10: ...ss the valve stopper to open Open all the system interception devices manual or automatic Start filling the device by slowly opening the system water filling tap Take a screwdriver and act on the brea...

Страница 11: ...nsable to keep the FCU in perfect working condition safe and reliable over the years This can be done every six months for some interventions and annually for others by the Technical Service Assistanc...

Страница 12: ...the system load losses To ensure a correct adjustment and balancing of the circuit follow the procedure indicated below With a screwdriver loosen and remove the slotted grub screw inside the hexagonal...

Страница 13: ...12 LOCKSHIELD ADJUSTMENT load losses based on the adjustment of the lockshield present in all kits...

Страница 14: ...3 WAY VALVE diagram of load losses of 3 way valve in completely open position 3 WAY VALVE 13 NL FR DE EN IT PL...

Страница 15: ...diagram of load losses of 3 way valve in completely closed position 14 LOCKSHIELD ADJUSTMENT...

Страница 16: ...do not intervene personally The ventilation does not activate even if there is hot or cold water in the hydraulic circuit The appliance leaks water during the heating function The appliance leaks wate...

Страница 17: ...fully tighten the connections The appliance leaks water during the heating function Leaks in the valve unit Check the state of the gaskets Check the correct positioning of the thermo acoustic insulati...

Страница 18: ...oid if the FCU is used under the aforementioned conditions The installer should contact Vasco for return shipment of defective components The installer will receive a warranty return number The defect...

Страница 19: ...Kruishoefstraat 50 B 3650 Dilsen T 32 0 89 79 04 11 F 32 0 89 79 05 00 info vasco eu www vasco eu 90 DR013038 D...

Отзывы: