
Chapter 6. CRAMPS/Multipulse Module Tests
54
UNITY
INOVA Solids Hardware Installation
01-999044-00 C0501
The adjustment to remove phase glitch is done either at the probe or at the 1 kW high band
amplifier. After setting
phase2=2
, enter
gf
and then interactively observe the FID, using
the
acqi
window.
If the FID shows a sine wave in the tram tracks, carefully adjust the probe tune or match to
remove it. If this cannot be done, carefully adjust the 1 kW amplifier tune or load. The
desired result is shown in
.
Figure 24. Real Channel FID Pattern
ACQUISITION
SAMPLE
PROCESSING
FLAGS
sfrq
399.952
date
Apr 1 lb
not
used
il
n
tn
H1
file
exp
sb
not used
in
n
np
128
DECOUPLING
gf
not used
dp
y
sw
2e+06
dn
H1
awc
not used
trig
y
fb
1e+06
dof
0
lsfid
0
SPECIAL
bs
16
dm
n
phfid
not used
srate
1542
ss
0
dpwr
30
fn
4096
temp
27.0
tpwr
54
tpwrf
3500
werr
tauc
10.000
pw
1.500
0
wexp
df
mp_at
0.000640
tau
3.500
wbs
d1
4.000
wnt
phase1
0
tof
-2986.3
phase2
0
nt
1
phaser
0
ct
1
FLAGS
ai cdc ph
Figure 27. FLIPFLOP desired FID
Содержание UNITY INOVA NMR
Страница 13: ...Introduction 12 UNITYINOVA Solids Hardware Installation 01 999044 00 C0501 ...
Страница 17: ...Chapter 1 Getting Started 16 UNITYINOVA Solids Hardware Installation 01 999044 00 C0501 ...
Страница 21: ...Chapter 2 Wideband NMR Module 20 UNITYINOVA Solids Hardware Installation 01 999044 00 C0501 ...
Страница 61: ...Chapter 6 CRAMPS Multipulse Module Tests 60 UNITYINOVA Solids Hardware Installation 01 999044 00 C0501 ...
Страница 65: ...Index 64 UNITYINOVA Solids Hardware Installation 01 999044 00 C0501 ...