Model 979 Series Helium Mass Spectrometer Leak Detector
DRAFT 9/15/03
1-11
1.5 Installation
The 979 Series leak detector is delivered completely assembled as ordered. Locate the
979 close to its power source and be sure there is at least four inch clearance for proper
ventilation, and sufficient room for the operator to safely maneuver to perform testing.
Additional ventilation requirements for your specific application as discussed in
Section 1.3.3 “Recommended Additional Services” on page 1-10 must also be provided at
this point.
NOTE
Refer to Section 1.5.1 “Bench System Installations” on
page 1-11 for instructions on bench system installations, which
require some customer configuration.
1.5.1 Bench System Installations
Figure 1-7 represents the process for installation of a bench system version of the 959/959D.
Note, cut the 3/4" black tubing into 2 equal lengths for use as shown.
Figure 1-7
970 Bench System Installation
Foreline
Connector
Содержание 979 Series
Страница 12: ...Model 979 Series Helium Mass Spectrometer Leak Detector This page intentionally left blank D R A F T 9 1 5 0 3 ...
Страница 112: ...Model 979 Series Helium Mass Spectrometer Leak Detector This page intentionally left blank D R A F T 9 1 5 0 3 ...
Страница 132: ...Model 979 Series Helium Mass Spectrometer Leak Detector This page intentionally left blank D R A F T 9 1 5 0 3 ...
Страница 138: ...Model 979 Series Helium Mass Spectrometer Leak Detector This page intentionally left blank D R A F T 9 1 5 0 3 ...
Страница 139: ......