3-90
V
ARI
*L
ITE®
-
VL2B
AND
VL2C
S
POT
L
UMINAIRE
S
ERVICE
M
ANUAL
CONFIDENTIAL
02.9631.0010
15 Jan 98
b. Using diagonal cutters, cut tie wrap securing high voltage
lamp wires and yoke cables to outer side rail. Remove one
6-32x5/16"PPB screw that secures tie wrap saddle holding
white high-voltage lamp wires to cable side rail cover and
remove saddle.
c. Remove grommets from white high-voltage lamp wires.
Step 12.
Remove ignitor board.
a. At ignitor board, remove four 6-32x1/4"PPZ screws, #6
internal tooth lock washers, and 0.5 inch outer diameter
nylon washers that secure ignitor board to cable side rail
and remove ignitor board.
Step 13.
Replace ignitor assembly by doing Steps 2 through 12 in
reverse. Nylon washer must be placed between cable side rail
standoff and ignitor board assembly.