Model ATRT-03 (v) Operating Instruction
27
14-1. Start-Up Menu
1.TEST XFMR 04/12/00
2.SETUP 13:06:02
3.CALCULATOR
4.DIAGNOSTIC
Figure 14-1. Start-up Menu
a. Description:
The “Start-Up” menu allows the user test a transformer, set-up time, select
computer interface, or use a calculator to manually enter voltage data for transformer turns-ratio
calculation and run diagnostics on the unit.
b. Origin:
The “Start-Up” menu first displays after power is applied to the ATRT-03/03A/03B.
c. Action Options:
Press key 1 to initiate a transformer test.
Press key 2 to set clock or select computer interface.
Press key 3 to calculate transformer turns ratio.
Press key 4 to run diagnostics.
Note:
Real time and date are shown on top left of LCD screen.
See section 11-1 for LCD contrast control.
Содержание ATRT-03
Страница 2: ...Model ATRT 03 v Operating Instruction 2...
Страница 26: ...Model ATRT 03 v Operating Instruction 24 Figure 13I Typical Connection for Bushing Mount CTs on Wye Transformer...
Страница 88: ...Model ATRT 03 v Operating Instruction 86 APPENDEX A Table of Standard Transformers...
Страница 89: ...Model ATRT 03 v Operating Instruction 87 APPENDIX B Table of Non Standard Transformers...
Страница 90: ...Model ATRT 03 v Operating Instruction 88 APPENDIX B Table of Non Standard Transformers cont...
Страница 91: ...Model ATRT 03 v Operating Instruction 89 APPENDIX B Table of Non Standard Transformers cont...
Страница 92: ...Model ATRT 03 v Operating Instruction 90 APPENDIX B Table of Non Standard Transformers cont...