![Vanguard Instruments Company CT-6500 Скачать руководство пользователя страница 48](http://html1.mh-extra.com/html/vanguard-instruments-company/ct-6500/ct-6500_operating-instructions-manual_3389266048.webp)
CT-6500 Operating Instructions
41
9.10.7 Analysis Point No.1 (AP1)
Three selections are available to the user for setting analysis point No. 1:
1. PERCENTAGE OF STRK
2. DISTANCE FROM CLOSE
3. CONTACT #1
a. Percentage of Stroke
Percentage of stroke is the distance based upon the percentage of the total breaker’s
stroke distance.
The distance is always measured from the starting point at the fully closed
position of the breaker contacts
. See appendix A for more detail.
b. Distance From Close
Distance from Close range is selectable from 00.0 inch to 99.99 inches or from 0.0
centimeter to 99.90 centimeters.
Again, the distance is referenced from the contact's
closed position.
See Appendix A for more detail.
c. Contact Point #1
Contact point is the distance from the contact's closed position to the point where it is in
transition from the close-to-open or the open-to-close position.
Contact channel #1 will be
used for the selection.
9.10.8 Analysis Point No. 2 (AP2)
There are three selections for analysis point 2:
1. PERCENTAGE OF STRK
2. DISTANCE FROM CLOSE
3. C/- TIME
a. See Paragraph 9.10.7.a for “PERCENTAGE OF STROKE” description.
b. See Paragraph 9.10.7.b for “DISTANCE FROM CLOSE” description.
c. “C/- TIME”, is available for both OPEN and CLOSE operation under analysis
point #2 only. For “C TIME”, the user enters the millisecond time after the contact
channel #1 made the transition from OPEN to CLOSE or CLOSE to OPEN to define the
Analysis Point No. 2.
For “CONTACT – TIME”, the user enters the millisecond time before the contact channel #1
makes the transition from OPEN to CLOSE or CLOSE to OPEN to define the Analysis
Point No. 2.
Содержание CT-6500
Страница 19: ...CT 6500 Operating Instructions 12 Figure 3 0 Series Contact Cable Connection...
Страница 41: ...CT 6500 Operating Instructions 34 Figure 16 0 Printout of the Timing Shot Directory From the Thermal Printer...
Страница 63: ...CT 6500 Operating Instructions 56 APPENDIX B CLOSE OPEN Timing Chart for ITE Circuit Breaker Model 14 4K...
Страница 64: ...CT 6500 Operating Instructions 57 APPENDIX C CLOSE OPEN Tabulated Report for ITE Circuit Breaker Model 14 4K...
Страница 65: ...CT 6500 Operating Instructions 58 APPENDIX D OPEN CLOSE Timing Chart for ITE Circuit Breaker Model 14 4K...
Страница 66: ...CT 6500 Operating Instructions 59 APPENDIX E OPEN CLOSE Tabulated Report for ITE Circuit Breaker Model 14 4K...
Страница 69: ...www vanguard instruments com...