9.0 Operating Procedures
The main steps to time a circuit breaker are listed in Figure 10.0.
.
Figure 10.0 CT-6500 Operating Steps
NOTE
To reduce the possibility of damaging the CT-6500 contact channels due to static
discharge in high voltage substations, it is recommend to ground one side of the
breaker’s bushings.
Always connect the CT-6500 ground stud to the substation ground before
connecting any cables to the unit.
HOOKUP CT-6500
1. GROUND THE CT-6500 (See NOTE)
2. CONNECT CT-6500 CABLES TO BREAKER
3. INSTALL TRANSDUCER WITH CABLE
APPLY POWER
1. TURN THE CT-6500 ON
2. PERFORM SELF TESTS: HOOK-UP TEST,
CABLE TEST, IF NECESSARY
TIME BREAKER
1. SELECT THE CT-6500 TEST
2. OPERATE THE BREAKER
GET RESULTS
1. READ OR PRINT THE TABULATED RESULTS
2. PRINT THE GRAPHICAL RESULTS
3. SAVE THE TIMING SHOT
Содержание CT-6500 2 Series
Страница 22: ...CT 6500 Series 2 Operating Instructions 21 Figure 4 0 Series Contact Cable Connection...
Страница 77: ...CT 6500 Series 2 Operating Instructions 76 APPENDIX F SIEMENS TCP Breaker Velocity Calculation...
Страница 78: ...CT 6500 Series 2 Operating Instructions 77 APPENDIX G SIEMENS SPS2 Breaker Velocity Calculation...
Страница 79: ...CT 6500 Series 2 Operating Instructions 78 APPENDIX H CT 6500 SIEMENS SPS2 Test Plan...
Страница 82: ...www vanguard instruments com...