Valor regency 328 Скачать руководство пользователя страница 4

This appliance does not contain any component

manufactured from asbestos or asbestos related

products.
The appliance data label is on the inner face of the
back panel at the lower left hand side. It is visible
when the outer case is removed.

Gas:

Natural (G20) 

Inlet pressure:

20mbar (8in. w.g.)

Input -    Max:

5.28kW (18,000Btu/h)

(Gross)   Min:

1.25kW (4,300Btu/h)

Output -  Max:

3.2kW (10,900Btu/h)

Min:

0.56kW (1,900Btu/h)

Burner injectors:
Upper (Centre radiant)

Bray cat 28 size 120

Lower (Outer radiants) 

Bray cat 28 size 250B

Burner test pressure
(cold): 

18.3mbar (7.2in w.g.)

Inlet pipe connection:

Rp1/4 (1/4” BSP)

Pilot & Atmosphere
sensing device

SIT ref. OP9044

Ignition:

Piezo electric
Integral with gas tap

Aeration:

Non-adjustable.

2.1

For the user’s protection, in the United
Kingdom it is the law that all gas appliances
are installed by competent persons in
accordance with the current edition of the Gas
Safety (Installation and Use) Regulations.
Failure to install the appliance correctly could
lead to prosecution. The Council for the
Registration of  Gas Installers (CORGI)
requires its members to work to recognised
standards.
In the United Kingdom the installation must
also be in accordance with:

A. These instructions.
B. All the relevant parts of local regulations.
C. The current edition of the Building Regulations

issued by the Department of  the Environment
and the Welsh Office or the Building
Standards (Scotland) Regulations issued by
the Scottish Development Department.

D. All relevant codes of practice.
E. The relevant parts of the current editions of the

following  British Standards:-
BS 715

BS 1251

BS 1289 Part 1

BS 1289 Part 2

BS 4543 Part 2

BS 5440 Part 1

BS 5440 Part 2

BS 5871 Part 1

BS 6461 Part 1

BS 6891

In the Republic of Ireland the installation must also conform with

the relevant parts of:

a) The current editions of:-

IS 813
ICP3

b)

All relevant national and local rules in force.

2.2

The appliance must not stand on a carpet or
any other combustible material.

If a panel has to be fitted to the fireplace opening to meet the

required opening sizes shown in these instructions it must be

made of non-combustible material.

2.3

The appliance can be installed in the
following situations.

Page 4

1.APPLIANCE DATA

INSTALLATION & SERVICING INSTRUCTIONS

2. GENERAL INSTALLATION

REQUIREMENTS

Valor Folium Format U/down 12/4  5/22/00  9:33 AM  Page 4

Содержание regency 328

Страница 1: ...IRELAND IE ONLY We trust that these instructions give sufficient details to enable this appliance to be installed and maintained satisfactorily However if further information is required our Valor adv...

Страница 2: ...ndards of safety quality and performance Careful Installation Valor is a Corgi registered company All our gas fires must be installed by a competent Corgi Registered Installer in accordance with our I...

Страница 3: ...ting the radiants 9 Full operating checks 9 Control setting check 9 Fitting bottom panel trims 10 Spillage check 10 Fitting dress guard 11 Final review 11 Servicing parts replacement 11 Replacing radi...

Страница 4: ...ers to work to recognised standards In the United Kingdom the installation must also be in accordance with A These instructions B All the relevant parts of local regulations C The current edition of t...

Страница 5: ...system conforming to BS1289 The appliance is suitable for installations conforming to older versions of BS1289 as well as the current edition The flue blocks must have a minimum width not less than 63...

Страница 6: ...bottom of the flue spigot See figure 2 2 7 The front face of the fireplace should be reasonably flat to ensure that a good seal can be made with the closure plate 2 8 The minimum clearance from the to...

Страница 7: ...ting to install it is worth checking that the piezo electric spark ignition system operates satisfactorily To initiate the spark depress the control knob and while keeping it depressed turn to the 1 I...

Страница 8: ...ther floor covering To achieve this the bottom of the closure plate must also be at least 102mm above the finished floor covering The centre of the flue spigot hole will be at least 486mm above the fi...

Страница 9: ...safety and servicing 4 3 3 The supply pipe must be of a rigid material e g copper A flexible connection must not be made 4 3 4 Pressure check the installation pipework for gas soundness in accordance...

Страница 10: ...nd tighten their securing screws 5 3 SPILLAGE CHECK A spillage check must be made before leaving the installed appliance with the customer 5 3 1 Close all doors and windows in the room containing the...

Страница 11: ...the radiants 6 6 Advise that any cleaning must only be carried out when the fire is off and cold 6 7 Mention that the radiants may become brown with use that this is quite normal and has no adverse e...

Страница 12: ...cage is cleaned before refitting Make sure that it locates squarely onto the pilot unit without any gaps between the cage edges and the pilot unit 7 4 TO REMOVE THE BURNER GAS TAP PILOT ASSEMBLY 7 4...

Страница 13: ...ing the split pin 7 8 TO REMOVE THE COMPLETE FIRE TO CHECK CHIMNEY FOR DEBRIS 7 8 1 To gain access see section 7 2 7 8 2 Remove the radiants and store in a safe place 7 8 3 Remove the floor plate 7 8...

Страница 14: ...levels of personal safety and performance efficiency it is essential that the opening at the back of the fire and the flue are kept clear of any form of obstruction It is possible that deposits of mo...

Страница 15: ...leaned with a damp cloth and dried with a soft duster Obstinate marks can be removed from the guard and trims using soapy water Never use abrasive cleaners The radiants can be cleaned with a soft brus...

Страница 16: ...pilot The pilot flame can be seen through the opening immediately below the centre radiant Figure 2 If the pilot does not light turn the control knob to OFF and try again In the unlikely event of fai...

Страница 17: ...will automatically shut off the supply of gas to the fire if for any reason the pilot goes out If this device does operate or if the fire is turned off accidentally or intentionally always wait three...

Страница 18: ...IN THE UNITED KINGDOM GB AND THE REPUBLIC OF IRELAND IE ONLY We trust that these instructions give sufficient details to enable this appliance to be installed and maintained satisfactorily However if...

Страница 19: ...ndards of safety quality and performance Careful Installation Valor is a Corgi registered company All our gas fires must be installed by a competent Corgi Registered Installer in accordance with our I...

Страница 20: ...you care for your Valor gas fire Please read thoroughly before using and keep for future reference We trust that these instructions give sufficient details to enable this appliance to be operated and...

Отзывы: