background image

5

Cement

board

Drywall opening

31”

(787 mm)

23-3/4” 

(603 mm)

c.  Pull out the receiver box. 

Remove the batteries 

from the receiver box if it contains any.

 You 

can remove the ignition wire to improve access 

to the receiver.

d.  Take the switch wire and plug it into the 

receiver’s connection slot as indicated (the other 

slot should already be fitted with the valve’s wire 

harness connector). See diagram at right.  

IMPORTANT: The 

connection can only be 

done one way. Do not 

force it or damage the 

pins!

e.  On the outside of the fireplace, run the switch 

wire into the outlet box.

f.  Plug the wire into the switch plate and to the 

outlet box.

g.  Reconnect the ignition wire to the receiver if it 

was previously removed.

h.  Insert 4 AA batteries in the receiver. Replace the 

cover.

i.  Test the operation of the wall switch.
j.  Fix the wall cover plate to the outlet box.
k.  Replace the receiver in its position and as well 

as the antenna if deployed.

8.  Install the cement 

board on top of the 

appliance. The board 

sits on the horizontal 

tabs at the top of the 

stud brackets. 

 

 

 

 

9.  Install the drywall at this point. Although it can be 

installed later, the mounting frame for the front will 

overlap it. 

Wall opening: 23-3/4” (w) x 31” (h) 

Note: 

If tiling, etc. is used overtop of drywall, 

complete steps 10, 11, and 12 first as the frame, 

once installed, will define where to tile up to.

CAUTION

DO NOT USE

 a screwdriver or other metallic object to 

remove the batteries from the receiver or the handset! 

This could cause a short circuit to the receiver.

CAUTION

To avoid short-circuit to the receiver, position the 

antenna

 

so that it 

DOES NOT TOUCH the ignition wire.

Ignition Wire 

Connection 

(spade type 

connector)

Be careful when 

removing and 

reinstallaing: not to 

bend or break the 

spade connector

Ignition Wire

Antenna

Valve Wire 

Harness

Wall Switch 

Harness

Содержание Portrait 569 Ledge Front

Страница 1: ...nd off Stand off Insulation Stud bracket Stud bracket Convection baffle Mounting frame Window frame cover Cement board Trim panel patina brushed nickel or black Trim panel lead in assembly 570FPB Fini...

Страница 2: ...n under bottom of trim for air gap 3 5 16 84 mm cement board and drywall thickness 1 2 13 mm wall finish thickness over top of drywall max 1 25 mm 1 2 13 mm when using 570 Plate 6 5 8 168 mm dia 3 5 8...

Страница 3: ...4 603 mm wide Minimum 12 3 4 324 mm Allow extra for rear vent elbow drywall 570 plate outline wall finish must be non combustible at top of opening gap must remain open for air flow cement board 23 3...

Страница 4: ...sert the grille in the firebox by aligning one of its side edge to the edge of the firebox as indicated b Raise the grille up to cover the top firebox ports and hold with one hand Note The port cover...

Страница 5: ...the wall cover plate to the outlet box k Replace the receiver in its position and as well as the antenna if deployed 8 Install the cement board on top of the appliance The board sits on the horizonta...

Страница 6: ...o the holes in the top piece and the frame s right piece Fix the three pieces together from the outside with all tabs inboard 2 screws NOTE All the side tabs of the bottom top and internal baffle piec...

Страница 7: ...el clearances if finish protrudes from plate Without 570 Plate 1 1 8 inch maximum 13 Lay the trim s front plate face down on a clean flat surface noting which end is the top as indicated Fix the lead...

Страница 8: ...8 Wiring Diagram Touch Control Wall Switch Connector...

Страница 9: ...002279BY 4002279BY 4002279BY 13 Convection Baffle 4002277BY 4002277BY 4002277BY 14 Touch Control Wall Switch with wire 4001487 4001487 4001487 15 LH Stud Bracket 4002516 4002516 4002516 16 RH Stud Bra...

Страница 10: ...nt rieurs Plaque de finition 570FPB Concept foyer 530 et Plaque de finition 570FPB vendus s par ment tapes d installation 1 rigez la charpente d encastrement du foyer 2 Installez le foyer avec les sup...

Страница 11: ...seur du panneau de b ton et du panneau de gypse 1 2 13 mm paisseur de la finition du mur par dessus le panneau de gypse max 1 25 mm 1 2 13 mm avec la plaque 570 6 5 8 168 mm diam tre 3 5 8 92 mm 7 1 8...

Страница 12: ...inimum 12 3 4 324 mm Ajoutez de l espace pour l vacuation arri re panneau de gypse Finition du mur Mat riau au dessus de l ouverture doit tre incombustible Contour de la Plaque 570 cet espace doit res...

Страница 13: ...du haut a Ins rez la grille dans la bo te de foyer en l alignant parall lement au bord de c t de la bo te de foyer tel qu indiqu b Soulevez la grille contre le panneau sup rieur de la bo te de foyer...

Страница 14: ...si elle a t d plac e 8 Installez la panneau de b ton au dessus de l appareil Le panneau doit reposer sur les languettes du haut des supports de montage la charpente 9 Installez le panneau de gypse Qu...

Страница 15: ...Tenez le d flecteur en place avec une main d Avec l autre main alignez les trous de fixation du c t droit du d flecteur avec les trous de la pi ce du dessus et ceux du support de montage droit Fixez...

Страница 16: ...Plaque 570 finition sous la plaque max 1 2 po 13 mm finition autour de la plaque voir les d gagements pour manteau et tablette si la finition d passe en saillie de la plaque b Sans la Plaque 570 max 1...

Страница 17: ...8 fils Marche Arr t Commutateur de r initialisation Veilleuse Soupape combin e 4 piles AA Compartiment piles tincelle R cepteur tincelle Thermocourant Bloc interrupteur Interrupteur marche arr t Inte...

Страница 18: ...Bordure de fen tre 4002279BY 4002279BY 4002279BY 13 D flecteur de convection 4002277BY 4002277BY 4002277BY 14 Interrupteur mural avec fil 4001487 4001487 4001487 15 Support de montage gauche 4002516...