30
*
Appr
o
x
.
66-1/2”
(1689 mm) with 24”
v
e
nt pipe
48”
(1219 mm) t
o
underside of c
ombustible ca
vit
y
24” pipe section
Appr
o
x. 44”
(1118 mm)
Stand-
off
Fireplace -
Left Side View
Note: Min. 24” total
rise required
48”
(1219 mm) t
o
underside of c
ombustible ca
vit
y
Appr
o
x. 35-3/4”
(908 mm)
*
Appr
o
x. 47”
(1194 mm)
*
Appr
o
x. 69-1/2”
(1765 mm) with 24”
v
e
nt pipe
Fireplace -
Left side view
24” pipe section
Note: Min. 24” total
rise required
Venting Considerations— Vertical Takeoff
Venting Considerations—Horizontal Takeoff
*
Notes—ALL venting considerations
• Dimensions of venting are based on
using Dura-Vent elbows. Elbow curve
radius dimensions will vary when using
other brands. In general, other brands
have slightly bigger radius.
• 3 inches clearance to combustibles
required above horizontal pipe. Slope
horizontal pipe upwards 1/4 inch per foot.
1 inch clearance required around sides
and bottom of horizontal pipe and around
vertical pipe.
• When calculating eff ective pipe lengths
subtract approximately 1-1/2 inch for
pipe joint - for example, a 12 inches pipe
section will add approximately 10-1/2
inches overall.
Framing Requirements
QUALIFIED
INSTALLER
Содержание H6 Series
Страница 78: ......